Sheet 1: REKAP BOQ
| REKAPITULASI | ||||||
| PEKERJAAN ARSITEKTUR, PONDASI DAN STRUKTUR, ELEKTRIKAL, PLUMBING, SPRINKLE DAN TATA UDARA | ||||||
| PEKERJAAN | : PEMBANGUNAN GEDUNG AULA KANTOR PUSAT PT. JASA RAHARJA | |||||
| LOKASI | : JL. HR.RASUNA SAID KAV. C2 JAKARTA SELATAN | |||||
| TAHUN | : 2022 | |||||
| URAIAN PEKERJAAN | JUMLAH | |||||
| NO | SUB JUMLAH | HARGA | ||||
| (Rp.) | ||||||
| I | PEKERJAAN ARSITEKTUR | - | ||||
| A. | PEKERJAAN PERSIAPAN | - | ||||
| B. | PEK. SIPIL ARSITEKTUR | - | ||||
| II | PONDASI DAN STRUKTUR | - | ||||
| A. | PEKERJAAN TANAH | - | ||||
| B. | PEKERJAAN PONDASI | - | ||||
| C. | PEKERJAAN LOWER STRUKTUR | - | ||||
| D. | PEKERJAAN UPPER STRUKTUR | - | ||||
| E. | PEKERJAAN ATAP | - | ||||
| III | ELEKTRIKAL | - | ||||
| A | PEMASANGAN PANEL | - | ||||
| B | PEMASANGAN KABEL FEEDER | - | ||||
| C | PEMASANGAN KABEL TRAY ARUS KUAT & ARUS LEMAH | - | ||||
| D | PEMASANGAN INSTALASI PENERANGAN & STOPKONTAK LANTAI 1 Berikut Armatur | - | ||||
| E | INSTALASI TOILET | - | ||||
| F | PEMASANGAN INSTALASI CCTV LANTAI DASAR | - | ||||
| G | PEMASANGAN INSTALASI CCTV LANTAI LANTAI 1 | - | ||||
| H | PEMASANGAN INSTALASI FIRE ALARM LANTAI 1 , TAMAN PARKING & LANTAI 2 | - | ||||
| I | PEMASANGAN INSTALASI TATA SUARA LANTAI 1 & LANTAI 2 | - | ||||
| J | PEMASANGAN INSTALASI Kabel Utp Data LANTAI 1 & LANTAI 2 | - | ||||
| K | TEST COMUISONING | - | ||||
| IV. | PLUMBING, SPRINKLER / HYDRANT DAN TATA UDARA | - | ||||
| A. | PEKERJAAN PLUMBING | - | ||||
| B. | SPRINKLER DAN HYDRANT | - | ||||
| C. | PEKERJAAN TATA UDARA | - | ||||
| JUMLAH (I+II_+III+IV) | - | |||||
| PAJAK 11% | - | |||||
| JUMLAH TOTAL | - | |||||
| DIBULATKAN | - | |||||
| Terbilang : | ||||||
| BILLING OF QUANTITY | ||||||
| (BOQ) | ||||||
| PEKERJAAN | : PEMBANGUNAN GEDUNG AULA KANTOR PUSAT PT. JASA RAHARJA | |||||
| LOKASI | : JL. HR. RASUNA SAID KAV. C2 JAKARTA SELATAN | |||||
| TAHUN | : 2022 | |||||
| No. | URAIAN PEKERJAAN | SAT. | VOL. | HARGA | JUMLAH | |
| SATUAN | HARGA | |||||
| (Rp.) | (Rp.) | |||||
| 1 | 2 | 3 | 4 | 5 | 6 = (4X5) | |
| I. | PEKERJAAN ARSITEKTUR | |||||
| A. | PEKERJAAN PERSIAPAN | |||||
| 1 | Mobilisasi dan demobilisasi | ls | 1.00 | |||
| 2 | Pengukuran & pasang papan acuan bouwplank | m' | 190.00 | |||
| 3 | Papan nama proyek | ls | 1.00 | |||
| Fasilitas Konstruksi dan Pengendalian Sementara | ||||||
| 4 | Pembersihan lokasi kerja sebelum, selama dan sesudah | m² | 585.00 | |||
| proyek berlangsung. | ||||||
| 5 | Buang tanah / puing keluar lokasi | ls | 1.00 | |||
| 6 | Kantor Lapangan / Direksi Kit | m² | 9.00 | |||
| 7 | Gudang Bahan dan Los kerja | m² | 27.00 | |||
| 8 | Fasilitas Air dan listrik kerja sementara | ls | 1.00 | |||
| 9 | Pek.Pas.Pagar Pengaman t. 1.8 m | m' | 198.00 | |||
| 10 | Biaya K3 (Asuransi dan alat keselamatan) rincian terlampir | ls | 1.00 | |||
| 11 | As Builtdrawing, Shopdrawing dan Dokumentasi | ls | 1.00 | |||
| 12 | Pekerjaan bongkar atap membran | m² | 780.00 | |||
| 13 | Sewa crane 3 ton | ls | 1.00 | |||
| JUMLAH PEKERJAAN PERSIAPAN | - | |||||
| B. | PEK. SIPIL ARSITEKTUR | |||||
| 1 | Dinding Hebel ( Toilet + R. Manajemen ) dim. 10x20x60 | m2 | 451.62 | |||
| 2 | Plester dinding ( Toilet + R. Manajemen ) ex. Mortar Mu-301 | m2 | 903.24 | |||
| 3 | Acian Dinding ( R. Manajemen ) ex. Mortar Mu-200 | m2 | 828.24 | |||
| 4 | Rangka Baja Ringan Dinding 70x50 C.75 | m2 | 658.36 | |||
| 5 | Pu Foam Insulation(Plafond)BARB Spray2005 Ex. IPU Tebal 2.5 cm | m2 | 430.82 | |||
| 6 | Plafond Gypsum Toilet + Manajemen | m2 | 146.38 | |||
| - Rangka Plafond baja ringan 40x40 0,3mm | ||||||
| - Gypsum board ex. Jayaboard 9mm | ||||||
| 7 | Plafond Gypsum Aula | m2 | 221.64 | |||
| - Rangka Plafond baja ringan 40x40 0,3mm | ||||||
| - Gypsum board ex. Jayaboard 9mm | ||||||
| 8 | Pengecatan Plafond | m2 | 221.64 | |||
| 9 | Plafond HPL | m2 | 209.18 | |||
| - Rangka Plafond baja ringan 40x40 0,3mm | ||||||
| - Rangka Besi Perkuatan tambahan dan penggantung 30x60mm 1,3mm modul 120x240cm + Penggantung 3 meter | ||||||
| - Multiplex 9mm fin. HPL ex. Carta CT-5264 T & CT-5266 T | ||||||
| 10 | Lisplank ex. Seven Aluminium Composite | Zq | ||||
| - Single pipe 3inch Fin. Duco | m' | 62.00 | ||||
| - Aluminium Composite ex. Seven + Rangka Besi Siku 30x30mm tebal 2,2mm | m' | 106.00 | ||||
| 11 | Railing Besi Koridor + Tangga Utama Fin. Epoxy ( Cat Dasar ) | m' | 116.60 | |||
| - Balustrade pipa bulat ½inci 1,1mm | ||||||
| - Ornamen hollow kotak 30x30 1,3mm Tinggi:15cm | ||||||
| - Finishing epoxy (cat dasar) | ||||||
| - Handrail merbabu dan finishing di tahap 2 | ||||||
| 12 | Talang air Stainless | m' | 98.00 | |||
| - Plat Stainless 0,4mm | ||||||
| - Rangka Besi Siku 40x40mm tebal 2,5mm | ||||||
| 13 | Sumur Resapan | titik | 3.00 | |||
| JUMLAH PEKERJAAN SIPIL ARSITEKTUR | - | |||||
| JUMLAH PEKERJAAN ARSITEKTUR | - | |||||
| II. | PONDASI DAN STRUKTUR | |||||
| A. | PEKERJAAN TANAH | |||||
| 1 | Galian Pondasi | m3 | 88.93 | |||
| 2 | Pasir Urug, t = 10 cm | m3 | 11.76 | |||
| 3 | Lantai Kerja, t = 5 cm | m3 | 5.88 | |||
| JUMLAH PEKERJAAN TANAH | - | |||||
| B. | PEKERJAAN PONDASI | |||||
| 1 | Pekerjaan Tiang Pancang | |||||
| - Mobilisasi Alat Pancang | Unit | 1.00 | ||||
| - Pengadaan Tiang Pancang Triangel Pile 300 mm (L=8m, 44 titik) | m | 339.36 | ||||
| - Pemancangan dengan Injection Pile | m | 339.36 | ||||
| - Pemotongan kepala tiang pancang | Titik | 42.00 | ||||
| - Pekerjaan sambungan (1 kali sambungan) | Titik | 42.00 | ||||
| - Test PDA | Titik | 5.00 | ||||
| 2 | Pile cap P1/P1A 1.5x1.5x0.85 | |||||
| - Beton K-350 | m3 | 15.30 | ||||
| - Pembesian | kg | 1,006.43 | ||||
| - Bekisting pondasi | m2 | 40.80 | ||||
| 3 | Pile cap P2 2,25x1.8x0.85 | |||||
| - Beton K-350 | m3 | 6.89 | ||||
| - Pembesian | kg | 734.95 | ||||
| - Bekisting pondasi | m2 | 13.77 | ||||
| 4 | Pile cap P3/P3A 2,25x2,25x0.9 | |||||
| - Beton K-350 | m3 | 8.56 | ||||
| - Pembesian | kg | 1,768.07 | ||||
| - Bekisting pondasi | m2 | 18.52 | ||||
| 5 | Pile cap P4 2,5x2.5x0.9 | |||||
| - Beton K-350 | m3 | 11.25 | ||||
| - Pembesian | kg | 1,034.08 | ||||
| - Bekisting pondasi | m2 | 18.00 | ||||
| 6 | Pile cap P5 3,0x2.5x0.9 | |||||
| - Beton K-350 | m3 | 12.75 | ||||
| - Pembesian | kg | 1,164.32 | ||||
| - Bekisting pondasi | m2 | 18.70 | ||||
| JUMLAH PEKERJAAN PONDASI | - | |||||
| C. | PEKERJAAN LOWER STRUKTUR | |||||
| 1 | Tie beam TB1 30/50 | |||||
| - Beton K-350 | m3 | 28.71 | ||||
| - Pembesian | kg | 8,043.85 | ||||
| - Bekisting balok | m2 | 191.40 | ||||
| 2 | Pedestal 750/750 | |||||
| - Beton K-350 | m3 | 6.30 | ||||
| - Pembesian | kg | 617.15 | ||||
| - Bekisting Kolom | m2 | 33.60 | ||||
| - Plat t= 20mm | Kg | 1,055.04 | ||||
| 3 | Pedestal 900/900 | |||||
| - Beton K-350 | m3 | 11.34 | ||||
| - Pembesian | kg | 1,025.94 | ||||
| - Bekisting Kolom | m2 | 50.40 | ||||
| - Plat t= 20mm | Kg | 1,004.80 | ||||
| JUMLAH PEKERJAAN LOWER STRUKTUR | - | |||||
| D. | PEKERJAAN UPPER STRUKTUR | |||||
| 1 | Kolom DIA. 70 | |||||
| - Beton K-350 | m3 | 26.40 | ||||
| - Pembesian | kg | 953.87 | ||||
| - Bekisting Kolom | m2 | 140.80 | ||||
| - Angkur M-22, inc; Baut | Titik | 40.00 | ||||
| - Plat t= 20mm | Kg | 401.92 | ||||
| 2 | Kolom Praktis | |||||
| Beton k-250 | m3 | 2.40 | ||||
| Pembesian | kg | 832.40 | ||||
| Bekisting | m2 | 44.52 | ||||
| 3 | Plat Lantai Cor | |||||
| Beton K-350 | m3 | (3.60) | ||||
| M10-2 Layer | kg | (255.30) | ||||
| Bondek 0.75 | m2 | (30.00) | ||||
| Bekisting | m2 | 195.00 | ||||
| 4 | Pek. Baja | |||||
| HBEAM 350.350.12.19; Inc Plat + Las Angkur | kg | - | ||||
| WF.250.125.6.9; Inc Plat + Las Angkur | kg | - | ||||
| WF.300.150.6,5.9; Inc Plat + Las Angkur | kg | - | ||||
| WF.400.200.8.13; Inc Plat + Las Angkur | kg | - | ||||
| WF.600.200.11.17; Inc Plat + Las Angkur | kg | - | ||||
| WF.600.300.12.20; Inc Plat + Las Angkur | kg | - | ||||
| Angkur m22 | pcs | 424.00 | ||||
| Mur Baut 22 | pcs | 4,854.00 | ||||
| Mur Baut 19 | pcs | - | ||||
| 5 | Tangga Utama (2 unit) | |||||
| - Beton Cor k.250 | m3 | 8.34 | ||||
| - Bekisting tangga | m2 | 34.78 | ||||
| - Pembesian | kg | 650.52 | ||||
| 6 | Pondasi Tangga | |||||
| - Beton Cor k.250 | m3 | 1.40 | ||||
| - Bekisting Pondasi | m2 | 14.00 | ||||
| - Pembesian | kg | 109.20 | ||||
| 7 | Tangga Service Manajemen (2 unit) | |||||
| - Beton Cor k.250 | m3 | 4.24 | ||||
| - Bekisting tangga | m2 | 29.78 | ||||
| - Pembesian | kg | 330.72 | ||||
| 8 | Tangga Service Operator + Bordes | unit | 2.00 | |||
| - Besi Unp 100 fin. Epoxy cat dasar | ||||||
| - Hollow 40x40mm tebal 1,6mm fin. Epoxy ( Cat dasar ) | ||||||
| - Multipleks Meranti 18mm | ||||||
| - Finishing Besi Duco dan finishing kayu parquet di tahap 2 | ||||||
| 9 | Bak Bunga Beton | |||||
| - Beton Cor k.250 | m3 | 6.80 | ||||
| - Pembesian | kg | 340.00 | ||||
| - Bekisting | m2 | 60.00 | ||||
| JUMLAH PEKERJAAN UPPER STRUKTUR | - | |||||
| E. | PEKERJAAN ATAP | |||||
| 1 | Pek. Atap Cremona besi pipa medium 2 inch t = 2.9 mm dan 3 inch t = 3.2 mm, fin. Duco ( Rangka Atap Bangunan ) | m2 | 758.44 | |||
| Atap spandek 0,4mm + Aluminium foil dua sisi + Poly Foam | m2 | 788.44 | ||||
| Rangka Baja ringan ( Atap ruang operator ) | m2 | 30.00 | ||||
| JUMLAH PEKERJAAN ATAP | - | |||||
| JUMLAH PEKERJAAN PONDASI DAN STRUKTUR | - | |||||
| BILLING OF QUANTITY | |||||||||
| (BOQ) | |||||||||
| PEKERJAAN | : PEMBANGUNAN GEDUNG AULA KANTOR PUSAT PT. JASA RAHARJA | ||||||||
| LOKASI | : JL. HR.RASUNA SAID KAV. C2 JAKARTA SELATAN | ||||||||
| TAHUN | : 2022 | ||||||||
| III. | ELEKTRIKAL | ||||||||
| NO | URAIAN | VOL. | SAT. | HARGA | JUMLAH | ||||
| SATUAN ( Rp ) | ( Rp ) | ||||||||
| A | PEMASANGAN PANEL | ||||||||
| Panel AC | |||||||||
| - | Pek.Pemasangan Box Wall Mounted Ukuran L60x80x20cm | 1.00 | Unit | ||||||
| - | SURGE ARESTER V25 OBO 25 ka | 1.00 | Unit | ||||||
| - | MCCB 100 Ampere 3 pole NSX | 1.00 | Unit | ||||||
| - | MCCB 3 Phase 30 Ampere 4 POLE Schneider Type NSX | 6.00 | Unit | ||||||
| - | MCB 1 Phase 20 Ampere 4,5 KA Domae | 6.00 | Bh | ||||||
| - | Pilot Lamp | 6.00 | Bh | ||||||
| - | Ampere Meter Analog 150/5a | 3.00 | Bh | ||||||
| - | Seletor Volt Schneider | 1.00 | Bh | ||||||
| - | Volt Meter Analog 500v | 1.00 | Bh | ||||||
| - | Schneider CT 200/5a/ | 3.00 | Bh | ||||||
| - | Busbar Tembaga Ukuran 4x25mm | 4.00 | M' | ||||||
| - | Material Bantu | 1.00 | Lot | ||||||
| - | |||||||||
| Panel Stopkontak | |||||||||
| - | Pek.Pemasangan Box Wall Mounted Ukuran L60x80x20cm | 1.00 | Unit | ||||||
| - | MCCB 3 Phase 160 Ampere 3 Pole NSX | 1.00 | Unit | ||||||
| - | MCCB 3 Phase 30 Ampere 4 POLE Schneider Type NSX | 6.00 | Unit | ||||||
| - | MCB 1 Phase 20 Ampere 4,5 KA Domae | 10.00 | Bh | ||||||
| - | Pilot Lamp | 3.00 | Bh | ||||||
| - | Ampere Meter Analog 150/5a | 3.00 | Bh | ||||||
| - | Volt Meter Analog 500v | 1.00 | Bh | ||||||
| - | Seletor Volt Schneider | 1.00 | Bh | ||||||
| - | Schneider CT 200/5a/ | 1.00 | Bh | ||||||
| - | Busbar Tembaga Ukuran 4x25mm | 3.00 | M' | ||||||
| - | Material Bantu ( Skun Kabel,Kabel Wiring,Pinil DLL ) | 1.00 | Lot | ||||||
| - | |||||||||
| Panel Penerangan | |||||||||
| - | Pek.Pemasangan Box Panel Wall Mounted Ukuran L40xD20xT60cm | 1.00 | Unit | ||||||
| - | Volt Meter Analog 500v | 1.00 | Unit | ||||||
| - | MCCB 3 phase 50 ampere EZC | 1.00 | Unit | ||||||
| - | Busbar Tembaga Ukuran 4x25mm | 3.00 | M' | ||||||
| - | Ampere Meter Analog 150/5a | 3.00 | Bh | ||||||
| - | Volt Meter Analog 500v | 1.00 | Bh | ||||||
| - | Seletor Volt Schneider | 1.00 | Bh | ||||||
| - | Schneider CT 200/5a/ | 3.00 | M' | ||||||
| - | Material Bantu ( Skun Kabel,Kabel Wiring,Pinil DLL ) | 1.00 | Lot | ||||||
| - | |||||||||
| JUMLAH PEMASANGAN PANEL | - | ||||||||
| B | PEMASANGAN KABEL FEEDER | ||||||||
| Pengerjaan berikut dengan gali timbun,pipa ,asesories DLL | |||||||||
| - | Kabel NYY 4x50mm2 dari RUANG ME Ke panel AC | 28.00 | M' | ||||||
| - | Kabel NYY 4x50mm2 dari RUANG ME Ke panel Stopkontak | 28.00 | M' | ||||||
| - | Kabel NYY 4x4mm2 dari RUANG ME Ke Penerangan | 28.00 | M' | ||||||
| - | Kabel NYY 4x16mm2 dari Panel Ac ke Outdoor AC | 72.00 | M' | ||||||
| - | Kabel NYY 4x4mm2 dari Panel Ac Outdoor AC Cassette | 94.00 | M' | ||||||
| JUMLAH PEMASANGAN KABEL FEEDER | - | ||||||||
| C | PEMASANGAN KABEL TRAY ARUS KUAT & ARUS LEMAH | ||||||||
| Instalasi Kabel Tray Lengkap dengan Asesories | |||||||||
| - | TRAY GALVANIS Type C Electro Ukuran 10x300x3000 | 64.00 | M' | ||||||
| - | Outsider Tray Ukuran 10x400 | 4.00 | Bh | ||||||
| JUMLAH PEMASANGAN KABEL TRAY ARUS KUAT & ARUS LEMAH | - | ||||||||
| D | PEMASANGAN INSTALASI PENERANGAN & STOPKONTAK LANTAI 1 Berikut Armatur | ||||||||
| Pemasangan instalasi lengkap dengan conduit,asesories DLL | |||||||||
| - | Instalasi Penerangan Kabel NYA 3x2,5mm2 | 142.00 | Titik | ||||||
| - | Instalasi StopKontak | 22.00 | Titik | ||||||
| - | Lampu Gantung VINTAGE 10 WAT led Bulb Warm White | 12.00 | unit | ||||||
| - | Lampu Led Selang 6,6Watt | 245.00 | mtr | ||||||
| - | Lampu PHILLIPS led Bulb 10 Watt E27 Warm White | 4.00 | Bh | ||||||
| - | Lampu Downlight PinHole 10 Watt Nerolight | 48.00 | Bh | ||||||
| - | Lampu RMI TL LED 2x16 Watt | 4.00 | Set | ||||||
| - | Lampu Track COB 20 Watt Spot | 12.00 | Bh | ||||||
| - | Track Light Panjang 2 meter | 3.00 | Batang | ||||||
| - | Saklar Clypsal 6 Digit | 4.00 | Set | ||||||
| - | Stop kontak 200Va | 8.00 | Bh | ||||||
| - | Stop kontak Lantai Panasonic | 3.00 | Set | ||||||
| JUMLAH PEMASANGAN INSTALASI PENERANGAN & STOPKONTAK LANTAI 1 Berikut Armatur | - | ||||||||
| E | INSTALASI TOILET | ||||||||
| - | Instalasi Penerangan Kabel NYA 3x2,5mm2 | 24.00 | Titik | ||||||
| - | Instalasi StopKontak | 2.00 | Titik | ||||||
| - | Exhaust Fan 8 Inch Maspion Cerobong | 8.00 | Set | ||||||
| - | Saklar Seri | 4.00 | Bh | ||||||
| - | Stop kontak 200Va | 2.00 | Bh | ||||||
| JUMLAH INSTALASI TOILET | - | ||||||||
| F | PEMASANGAN INSTALASI CCTV LANTAI DASAR | ||||||||
| Pemasangan dan pengadaan lengkap dengan asesories conduit ,klem DLL | |||||||||
| - | Instalasi CCTV Kabel | 9.00 | Titik | ||||||
| - | Kabel HDMI / 50 Mtr BAFO | 1.00 | Lot | ||||||
| Kabel HDMI /30 MTR | 1.00 | Lot | |||||||
| - | TV LED 32 Inch Lengkap Dengan Bracket | 2.00 | Unit | ||||||
| JUMLAH PEMASANGAN INSTALASI CCTV LANTAI DASAR | - | ||||||||
| G | PEMASANGAN INSTALASI CCTV LANTAI 1 | ||||||||
| Pemasangan dan pengadaan lengkap dengan asesories conduit ,klem DLL | |||||||||
| - | Pek.Pemasangan Instalasi CCTV | 19.00 | Titik | ||||||
| - | DVR 16 Channel 5MP 1080 (EDGE,DAHUA,SAMSUNG) | 2.00 | Unit | ||||||
| - | CCTV OUTDORR Hybrid 5Mp 4in1 Netal ( EDGE,HIKVISION,DAHUA,DLL ) | 5.00 | Unit | ||||||
| - | CCTV INDOOR Hybrid 5Mp 4in1 Netal ( EDGE,HIKVISION,DAHUA,DLL ) | 14.00 | Unit | ||||||
| - | HDD 1 TERRA | 1.00 | Unit | ||||||
| - | Power Suply 20 Output 20 Ampere | 2.00 | Unit | ||||||
| - | TV LED 40 Inch Lengkap Dengan Bracket | 1.00 | Unit | ||||||
| JUMLAH PEMASANGAN INSTALASI CCTV LANTAI 1 | - | ||||||||
| H | PEMASANGAN INSTALASI FIRE ALARM LANTAI 1 , TAMAN PARKING & LANTAI 2 | ||||||||
| Pemasangan dan pengadaan lengkap dengan asesories conduit ,klem DLL | |||||||||
| - | Instalasi Fire Alarm Kabel NYA 2x(1x1,5mm2) | 18.00 | Titik | ||||||
| - | Instalasi Fire Alarm Kabel Nyy 3x(4x1,5 ) Dari MCFA ke Anunsiator | 38.00 | M' | ||||||
| - | Smoke DETECTOR | 18.00 | Bh | ||||||
| - | ALARM BELL | 4.00 | Bh | ||||||
| - | Manual Call Point ( MCP) | 4.00 | Bh | ||||||
| - | INDICATOR LAMP | 4.00 | Bh | ||||||
| - | MCFA (Main Control Fire Alarm ) 5 Zone | 1.00 | Unit | ||||||
| - | ANUNSIATOR 5 ZONE | 1.00 | Unit | ||||||
| JUMLAH PEMASANGAN INSTALASI FIRE ALARM LANTAI 1, TAMAN PARKING & LANTAI 2 | - | ||||||||
| I | PEMASANGAN INSTALASI TATA SUARA LANTAI 1 & LANTAI 2 | ||||||||
| Pemasangan dan pengadaan lengkap dengan asesories conduit ,klem DLL | |||||||||
| - | Instalasi Tata Suara Kabel Nyyhy 2x1,5mm2 | 12.00 | Titik | ||||||
| JUMLAH PEMASANGAN INSTALASI TATA SUARA LANTAI 1 & LANTAI 2 | - | ||||||||
| J | PEMASANGAN INSTALASI Kabel Utp Data LANTAI 1 & LANTAI 2 | ||||||||
| Pemasangan dan pengadaan lengkap dengan asesories conduit ,klem DLL | |||||||||
| - | Instalasi Kabel Data | 7.00 | Titik | ||||||
| - | TP LINK EAP 115 300mbps Celling Mounted Access Point | 7.00 | Unit | ||||||
| - | |||||||||
| JUMLAH PEMASANGAN INSTALASI Kabel Utp Data LANTAI 1 & LANTAI 2 | - | ||||||||
| K | TEST COMUISONING | 1.00 | Lot | ||||||
| JUMLAH TOTAL BIAYA ELEKTRIKAL | - | ||||||||