Authentication
417x Filetype DOCX File size 0.51 MB
Economic Community Communauté Economique
of West African States des Etas de l’Afrique de l’Ouest
WEST AFRICAN POWER POOL (WAPP)
SYSTEME D’ECHANGES D’ENERGIE ELECTRIQUE OUEST AFRICAIN
Solar Development in Sub-Saharan Africa Program Phase 1 (Sahel)
SUB-SAHARAN AFRICA SOLAR PARKS DEVELOPMENT PROJECT (RSP) Phase 1
Assistance to West Africa Power Pool (WAPP)
(P162580)
GRIEVANCE MECHANISM
This document has been prepared in English and French. The English version is authoritative.
September 2021 (English Version)
1
2
ANNEXES
ANNEX 1 GM Management Action Plan 58
ANNEX 2a Complaints Registration Form 62
ANNEX 2b Verbal Complaints Registration Form 63
ANNEX 2c Template: Minutes of Complaints Management at the
Local Level 64
ANNEX 3 GM Monitoring and Recording Log (for non-SEA/SH 65
complaints)
ANNEX 4 Complaints Response Sheet 66
ANNEX 5 Quarterly Summary Table on Complaints Handling 67
ANNEX 6 Template Meeting Report 68
ANNEX 7 Template Complaints Form 69
ANNEX 8 Complaints Acknowledgment Form 70
ANNEX 9 Form for Official Response to a Complaint 71
ANNEX 10 Complaints Closure Form 72
ANNEX 11 Survivor consent Form 73
ANNEX 12 Intake Form 74
ANNEX 13 SEA/SH complaint verification Form 75
ANNEX 14 Code of Conduct for Implementing ESHS and Standard
Preventing Sexual Exploitation and Abuse and Sexual
Harassment (SEA/SH) and Violence Against Children (VAC) 78
ANNEX 15 Response Protocol for SEA/SH complaints 81
LIST OF TABLES
Table 1 Select International GM Standards and Good Practices
Table 2 Overview of Methodological Guidelines for GM Development
Table 3 Stakeholder Institutions
Table 4 Analysis of strengths and weaknesses in tradional community levelcomplaunts
Table 5 Categorization of “non-SEA/ SH” complaints 28
3
Table 6 GMs Indicative approximate timeframes for the complaints 32
Table 7 Reacap on steps and responsables for implementation of 39
Table 8: Reacp on steps and responsabilities for the implementation of GMs 44
Table 9: Complaints management action plan 53
Table 10 Estimated budget
LIST OF FIGURES
Figure 1: The new ECOWAS Master Plan for Regional Development of Power
Generation and Transmission Infrastructure
Figure 2: Diagram of the "Plug and Play" concept
Figure 3: Institutional mechanism for handling complaints
Figure 4: The GM Process
Figure 5: Diagram of the steps for handling for non-SEA/SH complaints
4
no reviews yet
Please Login to review.