What is APQP & PPAP?
AS9145
Inputs Processes Outputs
Program Advanced Productio
Needs Product n
Quality Part
Planning Approval
APQP Process
PPAP
• Structured methodology with defined outputs to ensure
new products satisfy customer needs and wants
• Uses project management to drive delivery and quality
performance to targets
• Proactive and preventative approach through cross
functional collaboration.
Why Use APQP?
Discuss the benefits of using APQP
Safety: Proactively seeks to identify and mitigate risks to product and process safety
Quality: Concerned with building quality into product and process designs; Provides
a toolset
and culture to achieve Zero Defects
Delivery: Drives on-time delivery of initial parts and ensures ongoing rate capability
Cost: Avoids the high costs associated with problems occurring during initial volume
production
People: Uses a cross-functional team to capitalise on available skills, knowledge &
experience
Discuss the reasons for applying APQP in your own areas
AS9145: The Standard
AEROSPACE AS9145
STANDARD
Issued 2016-11
Technically equivalent writings
published in IAQG sectors.
Aerospace Series – Requirements for Advanced Product
Quality Planning and Production Part Approval Process
RATIONALE
This standard was created to define the aviation, space and defence process requirements for Advanced Product Quality
Planning (APQP) and Productions Part Approval Process (PPAP). The APQP aspects of this standard define a methodology
for ensuring that the product development processes deployed throughout the aviation, space and defence industries are
fully integrated phased processes that extend from concept and deign through manufacturing process planning and
execution and on into product use, service and customer feedback. The PPAP is an output of APQP confirming that the
production process had demonstrated the potential to produce products that consistently fulfil all requirements at the
customer demand rate.
The IAQG created a multi-member group to author AS9145. The
standard is issued under the authority of SAE international, as
per all AS standards.
Associated Standards
The processes and supporting activities for achieving APQP
and PPAP should be embedded in the organisation’s quality
management system to ensure:
• The process is documented & controlled
• Documents are treated as quality records
• The process is subject to audits
• AS13003 Measurement Systems Analysis (MSA)
• AS13004 Process Failure Mode & Effects Analysis (PFMEA) and Control
• AS9100 Plans
• AS9102 Requirements for Aviation, Space & Defence Organisations
• AS9103 Aerospace First Article Inspection Requirement
• AS9110 Variation Management of Key Characteristics
Requirements for Maintenance Organisations.
APQP Phases
Preliminar Critical
y Design Design
Review Review
Initial
Kick off End of Design Production Production
Concept Release (CDP) Approval Launch
(PDR)
Product Development
Process (PDP)
1. Planning 5. On-going Production, Use
Phases of Advanced and
Post-delivery Service
Product Quality 2. Product Design and Development 4. Product &
Planning (APQP) Process
Validation
3. Process Design and Development
Key Production Part Production FAIR PPAP
Approval Process Readiness Approval
Review Production
(PPAP) Events Process Run
Product Status Prototype / test Production trial Production products
product products
Discuss: how does your gated NPI process fit around this?
no reviews yet