IV. Stamping Tooling Detail |
|
|
|
|
|
|
|
|
|
|
|
Supplier: |
|
|
|
|
Item #: |
|
|
|
|
Aisin Part #: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Material |
Part Material class |
|
|
|
|
|
|
|
|
|
Currency |
Tool Purchase currency |
|
|
|
|
|
|
|
|
|
Process |
Parts per Stroke |
|
|
|
|
|
|
|
|
Analysis |
Analysis required? |
|
|
|
|
|
|
|
|
|
|
|
|
|
Number of Processes |
|
Measure |
Tap |
Nut Insertion |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Specific Material / Grade |
|
|
|
|
|
|
|
|
|
Exchange Rate Used / USD |
|
|
|
|
|
|
|
|
|
Required Tonnage |
|
|
|
|
|
|
|
|
Iterations performed |
|
|
|
|
|
|
|
|
|
|
|
|
|
0 |
|
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Dual Phase Material? |
|
|
|
|
|
|
|
|
|
Date paid: |
|
|
|
|
|
|
|
|
|
Actual (rated) tonnage |
|
|
|
|
|
|
|
|
Stamping process |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Size of (in mm) |
Length (mm) |
Width (mm) |
Thickness (mm) |
# of Die Shoes Mounted on this plate? |
|
# of Cams |
Width (mm) |
Quantity |
Operation # ( below) |
Custom? |
2nd Width (mm) |
2nd Quantity |
Operation # ( below) |
Custom? |
|
|
|
Tool Type |
|
Blank Area |
Blank area row |
|
|
Row |
549.99999999999 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Blank Size |
|
|
|
0 |
|
Single Action |
|
|
|
|
|
|
|
|
|
|
|
Form |
|
0 |
Progressive Dies |
|
1 |
0 |
|
2 |
550 |
1199.999999999 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Master Locator Plates |
|
|
|
0 |
|
Double Action |
|
|
|
|
|
|
|
|
|
|
|
Pierce |
|
|
Required Tonnage |
|
|
|
|
3 |
1200 |
4500 |
|
|
|
|
Cam Cost Adder - All Dies ($ per cam) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Die Shoe |
|
|
|
0 |
|
Aerial |
|
|
|
|
|
|
|
|
|
|
|
Trim |
|
|
0 |
1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sub-Plates (lower) |
|
|
|
|
|
Polishing for A-surface appearance parts (area in cm2) - note on ISO View |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Coin |
|
Row # |
|
Base Tool Cost |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sub-Plates (Upper) |
|
|
|
|
|
Fingers |
|
|
|
Extra Design/Machining countoured Surface?(cm2) |
|
|
|
|
|
|
|
Flange |
|
1 |
1 |
1 |
|
Base Dies |
Deep Draw |
Measure, Tap & Nut Insertion |
CAM(s) |
Adjustment % |
Deep Draw Adj |
QDC Plates |
Bars & Fingers |
Other |
Total |
Cam Width |
|
0 |
76.2 |
Quantity |
Quantity |
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
QTY |
Area (mm2) |
|
|
|
Servo Press? |
|
|
|
|
|
|
|
|
|
Bars |
|
|
|
Deep Draw /Crash Form? |
Deep Draw: the depth of the draw is > the distance across the narrowest portion of the opening created in the part or the draw depth in a single station is 2 X or more the min part width.
|
|
Operation #? |
|
|
|
|
|
|
Form |
|
2 |
0 |
0 |
Progressive |
$- |
|
0 |
$- |
#N/A |
|
$- |
$- |
$- |
#N/A |
Single Action Cam |
|
|
$1,250 |
0 |
0 |
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
QDC Plates |
|
|
|
|
|
|
|
|
|
X-hatched Die Shoes>12 ft? |
|
|
|
|
|
|
|
|
|
Closed Die (Set) Dimension (L x W x H) |
|
|
|
|
|
|
|
|
|
|
|
|
|
KO Pin? |
|
|
|
|
|
|
Bend |
|
3 |
0 |
0 |
Transfer |
$- |
0 |
0 |
$- |
#N/A |
0 |
$- |
$- |
$- |
#N/A |
Double Action Cam |
|
|
$1,750 |
0 |
0 |
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nitrogen Cyl Sets (dia) |
|
|
|
|
|
|
|
|
|
Developed Blank? |
|
|
|
|
|
|
|
|
|
Stroke Height Required: |
|
|
|
|
|
|
|
|
|
|
|
|
Feed Height Required |
|
|
|
|
|
|
Re-strike |
|
4 |
0 |
0 |
Tandem |
$- |
0 |
0 |
$- |
#N/A |
0 |
$- |
$- |
$- |
#N/A |
Aerial/Flying Cam |
|
|
$1,750 |
0 |
0 |
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nitrogen Tank |
|
|
|
|
|
|
|
|
|
Adjustable Form Mtl in Die? |
|
|
|
|
|
|
|
|
|
Comment or any additional info for tooling cost: |
|
|
|
|
Draw |
|
5 |
0 |
0 |
Blank |
$- |
|
0 |
$- |
#N/A |
|
$- |
$- |
$- |
#N/A |
Cam Width |
|
76 |
152.4 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Guided Stripper Plates? |
|
|
|
|
|
|
|
|
|
Cast Die Shoes? |
|
|
|
|
|
|
|
|
|
|
|
|
Idle |
|
6 |
0 |
0 |
Other |
|
|
0 |
|
|
|
|
|
|
|
Single Action Cam |
|
|
$2,500 |
0 |
0 |
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Springs (dia) |
|
|
|
|
|
|
|
|
|
|
|
Weight (kg) |
|
|
|
|
Upper |
|
|
|
|
|
In-Die Measure |
|
7 |
0 |
0 |
|
|
|
|
|
|
|
|
|
|
|
Double Action Cam |
|
|
$3,500 |
0 |
0 |
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Heel/Thurst Block Sets |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Lower |
|
|
|
|
|
Tapping |
|
8 |
0 |
0 |
|
|
|
|
|
|
|
|
|
|
|
Aerial/Flying Cam |
|
|
$3,500 |
0 |
0 |
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Short Flange (list size) |
|
|
|
|
|
|
|
|
|
Total Tool Weight (kg) |
|
|
|
|
|
|
|
|
|
|
|
|
Nut Insertion |
|
9 |
0 |
0 |
|
Tandem Dies |
Transfer Dies |
|
|
|
Cam Width |
|
152 |
330 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Type of Blank Process? |
|
|
|
|
|
|
|
|
# of Tool Sets Quoted |
|
|
|
|
|
|
|
This should only be greater than one if additional tool sets are needed to meet capacity (cycle time, not machine capacity)
1 |
|
|
|
|
Other |
|
10 |
0 |
0 |
|
(1) tandem Dies Only |
(1) Transfer Dies Only |
|
|
|
Single Action Cam |
|
|
$3,000 |
0 |
0 |
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Mtl Lift Height (mm) |
Description (For ECI, describe Modification) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Yes |
Y |
11 |
0 |
0 |
|
Blank Pierce Trim Coin |
Flange Form Bend Restrike |
|
Draw |
Blank Pierce Trim Coin |
Flange Form Bend Restrike |
Draw |
(3) Transfer idle stations only |
|
|
Double Action Cam |
|
|
$4,750 |
0 |
0 |
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Operation: |
(blank, draw, pierce, trim, form, idle, restrike, Draw, In-Die Measurement, Nut Insertion, bend, Flange, coin, tapping, etc.)
List all idles
Type |
|
Strip / Blank Layout (For ECI's, note change areas) |
|
|
|
No |
N |
12 |
0 |
0 |
|
|
|
|
Aerial/Flying Cam |
|
|
$4,750 |
0 |
0 |
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
|
|
|
|
|
|
|
|
Rate Calc |
|
13 |
0 |
0 |
|
|
|
|
Cam Width |
|
330 |
508 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2 |
|
|
|
|
|
|
|
0 |
|
14 |
0 |
0 |
# of Dies |
0 |
0 |
|
0 |
0 |
0 |
0 |
0 |
|
|
Single Action Cam |
|
|
$3,500 |
0 |
0 |
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3 |
|
|
|
|
|
|
|
0 |
|
15 |
0 |
0 |
|
$6,000 |
$7,000 |
|
$8,000 |
$8,500 |
$9,500 |
$11,500 |
$2,500 |
|
|
Double Action Cam |
|
|
$6,000 |
0 |
0 |
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4 |
|
|
|
|
|
|
|
0 |
|
16 |
0 |
0 |
Total |
$- |
$- |
|
$- |
$- |
$- |
$- |
$- |
|
|
Aerial/Flying Cam |
|
|
$6,000 |
0 |
|
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5 |
|
|
|
|
|
|
|
0 |
|
17 |
0 |
0 |
|
|
|
|
|
|
|
|
|
|
|
Cam Width |
|
508 |
1016 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6 |
|
|
|
|
|
|
|
0 |
|
18 |
0 |
0 |
|
|
|
|
|
|
|
|
|
|
|
Single Action Cam |
|
0 |
$3,500 |
0 |
0 |
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7 |
|
|
|
|
|
|
|
0 |
|
19 |
0 |
0 |
|
Part Material |
|
Shear |
|
|
|
|
|
|
|
Double Action Cam |
|
0 |
$6,000 |
0 |
0 |
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8 |
|
|
|
|
|
|
|
0 |
|
20 |
0 |
0 |
|
270 |
|
Compound |
|
|
|
|
|
|
|
Aerial/Flying Cam |
|
0 |
$6,000 |
0 |
0 |
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
9 |
|
|
|
|
|
|
|
0 |
|
21 |
0 |
0 |
|
>270 - 590 |
|
Progressive |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
10 |
|
|
|
|
|
|
|
|
|
22 |
|
0 |
|
>590 - 780 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Cam Total |
|
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11 |
|
|
|
|
|
|
|
|
|
23 |
|
0 |
|
>780 - 980 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
12 |
|
|
|
|
|
|
|
Tool Estimate |
|
24 |
|
0 |
|
>980 - 11280 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
13 |
|
|
|
|
|
|
|
Enter detail for each Station |
|
25 |
|
0 |
|
Galvanized |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
14 |
|
|
|
|
|
|
|
Replacement or Additional |
|
26 |
|
0 |
|
Aluminum |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
15 |
|
|
|
|
|
|
|
#VALUE! |
|
27 |
|
0 |
|
Stainless Steel |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
16 |
|
|
|
|
Part ISO View (For ECI's, note change areas) |
|
|
|
Total Tool Estimate including multiple tools |
|
|
|
|
|
Copper |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
17 |
|
|
|
|
|
|
|
|
#VALUE! |
IF material is Dual Phase, Cost Adder for 2nd phase material is not included. |
|
|
|
|
Other |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
18 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
19 |
|
|
|
|
|
|
|
|
|
|
Tool Lead-Time Estimate |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
20 |
|
|
|
|
|
|
|
|
|
|
#VALUE! |
Weeks |
|
|
6.731 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
21 |
|
|
|
|
|
|
|
Lead Time Est. |
|
|
0 |
Tool Design & Try-out |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
22 |
|
|
|
|
|
|
|
#VALUE! |
Weeks |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
23 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
24 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
25 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
26 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
27 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
28 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
29 |
|
|
|
|
|
|
|
|
|
In-house |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
30 |
|
|
|
|
|
|
|
|
|
Local Vender |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Complete this section for ECI Modifications |
|
|
|
|
|
|
|
Overseas Parent |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Cost Detail: |
$/Hr. |
Hours: |
Total: |
|
ECI Quoted Changes: Submit duplicate copy of this sheet with change details below for each ECI. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Overseas Supplier |
|
|
|
Ejector Pins |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Design Labor - Mechanical |
|
|
$0 |
|
Previous ECI # |
Quoted Amt |
Change Description |
|
|
|
|
|
|
|
|
|
Add |
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Design Labor - Electrical |
|
|
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Remove |
$0 |
|
|
Size Range |
Boss |
Base ~ 30 mm |
Clip Tower (H-Rib) |
Base ~ 30 mm |
Rib Change |
Part Surface/Thickness Change |
Parting Line Change |
Mechanical Slide/Lifter |
Hydraulic Slide |
Insert |
|
Design Labor - Pneumatic/Hydraulic |
|
|
$0 |
|
|
|
|
|
|
|
|
Boss |
|
|
|
|
|
|
|
Row # |
Lower |
Upper |
Add Boss |
Remove Boss |
Add Boss (With Sleeve) |
Remove Boss (With Sleeve) |
Add |
Remove |
New/ Heighten |
Remove/Shorten |
Modify Cavity (Machine) |
Modify Cavity (Weld+Machine) |
Modify Core (Machine) |
Modify Core (Weld+Machine) |
Addition of Radius (Non PL Mod) |
Modify Cavity (Machine) |
Modify Cavity (Weld+Machine) |
Modify Core (Machine) |
Modify Core (Weld+Machine) |
New Slide |
New Lifter |
Eliminate Slide |
Eliminate Lifter |
Modify Slide/Lifter (Machine) |
Modify Slide/Lifter (Weld+Machine) |
New Slide |
Eliminate Slide |
Modify Slide (Machine) |
Modify Slide (Weld+Machine) |
New Insert |
Modify |
|
Programming Labor - (CNC,EDM & CMM) |
|
|
$0 |
|
|
|
|
|
|
|
|
|
Add Boss |
|
$0 |
|
New |
|
|
1 |
0 |
30 |
0 |
|
|
|
|
|
$560 |
$910 |
|
|
|
|
$650 |
$1,820 |
$2,080 |
$1,820 |
$2,080 |
$3,437 |
$2,778 |
$1,675 |
$1,675 |
$1,560 |
$1,680 |
$5,532 |
$2,700 |
$2,080 |
$2,470 |
|
|
|
CNC Machine Labor |
|
|
$0 |
|
|
|
|
|
|
|
|
|
Remove Boss |
|
$0 |
|
Modify |
|
|
2 |
30 |
50 |
|
|
|
|
|
|
$560 |
$910 |
|
|
|
|
$650 |
$1,820 |
$2,080 |
$1,820 |
$2,080 |
$3,437 |
$2,778 |
$1,675 |
$1,675 |
$1,560 |
$1,680 |
$5,532 |
$2,700 |
$2,080 |
$2,470 |
|
|
|
Conv. Machine Labor |
|
|
$0 |
|
ECI # |
|
Reason for Change |
|
|
|
|
|
|
Add (w/ Sleeve) |
|
$0 |
|
|
|
|
3 |
50 |
100 |
|
|
|
|
|
|
$1,120 |
$1,365 |
|
|
|
|
$1,300 |
$2,730 |
$3,120 |
$2,730 |
$3,120 |
$4,096 |
$3,108 |
$2,500 |
$2,500 |
$2,340 |
$2,500 |
$6,849 |
$3,750 |
$3,120 |
$3,640 |
|
|
|
Welding Labor |
|
|
$0 |
|
Modification Area / size |
|
|
|
|
|
|
Remove (w/ Sleeve) |
|
$0 |
|
Diamond Polish |
$0 |
|
4 |
100 |
200 |
|
|
|
|
|
|
$1,960 |
$2,048 |
|
|
|
|
$2,470 |
$2,730 |
$3,120 |
$2,730 |
$3,120 |
$4,096 |
$3,108 |
$2,500 |
$2,500 |
$2,340 |
$2,500 |
$6,849 |
$3,750 |
$3,120 |
$3,640 |
|
|
|
Assembly Labor - Mechanical |
|
|
$0 |
|
Item |
$/Hr. |
Hours: |
Total: |
Item |
$/Hr. |
Hours: |
Total: |
|
|
|
|
|
|
Clip Tower |
|
|
|
|
Texture Repair/Change |
$0 |
|
5 |
200 |
300 |
|
|
|
|
|
|
|
|
|
|
|
|
$3,458 |
$3,900 |
$4,420 |
$3,900 |
$4,420 |
$5,413 |
$3,766 |
$5,000 |
$5,000 |
$4,420 |
$4,940 |
$9,483 |
$7,000 |
$4,940 |
$5,460 |
|
|
|
Assembly Labor - Electrical |
|
|
$0 |
|
Design Cost |
|
|
$0 |
Bench |
|
|
$0 |
|
|
|
|
|
|
|
Add |
|
$0 |
|
Engraving per line |
$0 |
|
6 |
Add per mm |
0 |
|
|
|
|
|
|
$8.40 |
$6.83 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Assembly Labor - Pneumatic/Hydraulic |
|
|
$0 |
|
Material: |
|
|
$0 |
Heat Treat |
|
|
$0 |
|
|
|
|
|
|
|
Remove |
|
$0 |
|
|
|
|
7 |
0 |
2500 |
|
|
|
|
|
|
|
|
$1,300 |
$1,820 |
$1,300 |
$1,820 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
$1,106 |
$664 |
|
Material - Raw |
|
$0 |
|
Programming. |
|
|
$0 |
Polishing |
|
|
$0 |
|
|
|
|
|
|
Rib Change |
|
|
|
Max |
Row |
Max |
Row |
8 |
2500 |
40000 |
|
|
|
|
|
|
|
|
$1,820 |
$2,600 |
$1,820 |
$2,600 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
$2,212 |
$1,327 |
|
Material - Purchased Components |
|
$0 |
|
Dis-Assembly |
|
|
$0 |
Coating |
|
|
$0 |
|
|
|
|
|
ECI Cost Estimate |
|
New / Heighten |
|
$0 |
0 |
0 |
0 |
0 |
9 |
40000 |
1000000 |
|
|
|
|
|
|
|
|
$2,600 |
$3,770 |
$2,600 |
$3,770 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
$4,424 |
$2,654 |
|
Material - Electrical |
|
$0 |
|
CNC Machining |
|
|
$0 |
Assembly |
|
|
$0 |
|
|
|
|
|
$0.00 |
|
Remove / Shorten |
|
$0 |
0 |
0 |
0 |
0 |
10 |
Add per mm2 |
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Heat Treat |
|
$0 |
|
Conv. Machining |
|
|
$0 |
Tryout & Tune |
|
|
$0 |
|
|
|
|
|
|
Part Surface / Thickness Change |
|
|
|
Area |
Row |
Area |
Row |
|
0 |
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Coating |
|
|
Type: |
|
$/Kg |
|
|
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Cost |
$0 |
|
|
|
|
|
|
|
Cavity (Machining) |
|
$0 |
0 |
0 |
0 |
0 |
|
|
|
$0 |
$0 |
$0 |
$0 |
$0 |
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Tryout Labor Cost |
|
|
$0 |
|
Change items (List sizes in mm, areas in mm2, and diameters in mm) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Cavity (Weld & Machining) |
|
$0 |
0 |
0 |
0 |
0 |
|
Mechanical Slide / Lifter |
|
|
Area |
Row |
Area |
Row |
|
Hydraulic Slide |
|
|
Area |
Row |
Area |
Row |
Insert |
|
Area |
Row |
Area |
Row |
|
|
|
|
|
|
|
|
|
|
|
CMM Labor - (Layout) |
|
|
$0 |
|
List Change Item |
Change Content |
Size /Area |
Qty |
Change Content |
Size /Area |
Qty |
|
|
|
|
|
Core (Machining) |
|
$0 |
0 |
0 |
0 |
0 |
|
New Slide |
|
$0 |
0 |
0 |
0 |
0 |
|
New Slide |
|
$0 |
0 |
0 |
0 |
0 |
New |
$0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
|
|
Tryout Material Cost |
|
|
$0 |
|
L |
W |
L |
W |
|
|
|
|
|
Core (Weld & Machining) |
|
$0 |
0 |
0 |
0 |
0 |
|
New Lifter |
|
$0 |
0 |
0 |
0 |
0 |
|
Eliminate Slide |
|
$0 |
0 |
0 |
0 |
0 |
Modify |
$0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
|
|
Packaging |
|
|
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Add Radius (Non PL Mod) |
|
$0 |
0 |
0 |
0 |
0 |
|
Eliminate Slide |
|
$0 |
0 |
0 |
0 |
0 |
|
Lifter (Machining) |
|
$0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Form Analysis |
|
|
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Parting Line Change |
|
|
|
|
|
|
|
|
Eliminate Lifter |
|
$0 |
0 |
0 |
0 |
0 |
|
Lifter (Weld+Machine) |
|
$0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Transport cost (Tool builder to Production location) |
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Cavity (Machining) |
|
$0 |
0 |
0 |
0 |
0 |
|
Lifter/Slide (Machining) |
|
$0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other: |
|
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Cavity (Weld & Machining) |
|
$0 |
0 |
0 |
0 |
0 |
|
Lifter/Slide (Weld+Machine) |
|
$0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total |
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Core (Machining) |
|
$0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Core (Weld & Machining) |
|
$0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Timing: (If ECI, list latest ECI change timing) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Lead-time Quoted (weeks after K.O.) |
|
|
|
|
|
|
|
|
|
|
Base Tool |
ECI |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1st Off Parts |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sample Parts (tuned parts) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Part Approval (all documentation) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Production Ready |
|
|
|
|
|
|
|
|
|
|
|
|
|
Modification by: |
|
Vendor Address: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
36-38-40-45-68 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
For Internal Use Only: |
|
|
|
|
|
|
|
TC |
|
TT |
|
EC |
|
Completed By: |
|
|
|
|
|
Aisin Asset # |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
BB |
|
36-38-40-45-68 |
|
|
|
|
|
TR |
|
LT |
|
|
|
Date: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|