Sheet 1: Instructions
Instructions:
























Stage 1 - Request for Quotation
Please complete the following forms (tabs) and return to DAC buyer within the required leadtime (Typically 7-10 business days):
Piece Price Cost Detail
Tooling Breakdown Cost Detail

Requirements:
- Piece Price Cost Detail Sheet and Tooling Breakdown Cost Detail Sheet totals MUST equal.
- Please note ANY EXCEPTIONS, print and/or tooling, in the designated area on the Tooling Breakdown Cost Detail Sheet
- Quote will include duplicate gauging to be sent to DAC. NOTE: Supplier is responsible for the cost of gauging at their facility; DAC will pay for gauges
coming to our facility. Gauge quote should be "DAC gauges only"


Sheet 2: Piece Price Cost Detail

Request
for Quote
Date:

Quote #
Company Name:

Est. Annual Usage:
RFQ #

Start of Production:
Part Number:
Rev. Level

Vehicle Model:
Part Name:



Program Life:
Quote to be returned by:



Currency/Rate
FOB Point:



Mfg. Location:















Stamping/Casting
Material Type/Grade
Pcs per Cycle Thickness (mm) Width (mm) Length (mm) Blank Weight (LB) $/LB Scrap Weight (LB) Scrap $/LB Net Weight (LB) Cost Total













































































Total Material Cost: $-
Molding















Part # Part Name Material Spec. Volume given in Cubic Inches Density (lbs/in3) Minimum REQUIREMENT IS Volume Part, # of parts/Run'r/O"flow, and Density to calculate GRS. WT.
LBS.
IF Net Wt. IS NOT known, Please LEAVE BLANK NET. WT.
LBS.
Material Cost
$ Per LB.
Scrap Value
$ Per LB.


Volume Part Volume of Run'r/O'flows # of parts / Run'r/O'flow Material Price
$ Per Piece














































































































Total Material Cost: $-
Components















Part Number
Part Description Material Pcs/Assembly $/Pc Cost Total
























































Total Component Cost $-
Processing





Labor Equipment



Operation Number of Stations Machine Size
Cycle / Strokes per Hr Pieces/Hr Labor $/Hr Labor $/pc Pieces/Hr Machine $/Hr Machine $/pc Sub-Total Cost Process Efficiency % Cost Total










$-










$-












$-













$-











$-











Total Processing Cost: $-
Packaging **Weight limit per box is 32 LBS









No. of Parts/Package

Packaging Type:


Expendable
Returnable







Interior Dunnage Required?
























Height Width Length
Cost $/Box Pcs/Box Cost $/Pc


Box dimensions (mm) 0 0 0





Box dimensions (in)























Other Total Tooling/Gauging Costs


Tool Cost:
Final Cost Total Material Cost:
Duplicate/DAC Gauge Cost:

Total Material Cost:
*DO NOT include supplier gauge cost Total Component Cost: $-
Total Cost: $0 Total Processing Cost: $-





Tool Build Time:
weeks Total Manufacturing Cost: $-





PPAP lead-time
weeks
S&GA %:
$-
Production lead-time
weeks
Profit %:
$-
Tooling Country of Origin

Total Sales Price: #VALUE!
Manufacturing Country of Origin











































Check box to left if you have a Value Added idea. Include attachments as necessary.


















Submitted by:

Date Quoted:




















Signature:

Quote Expires:





The words contained in this file might help you see if this file matches what you are looking for:

...Sheet instructions stage request for quotation please complete the following forms tabs and return to dac buyer within required leadtime typically business days piece price cost detail tooling breakdown detailrequirements totals must equal note any exceptions print andor in designated area on quote will include duplicate gauging be sent supplier is responsible of at their facility pay gauges coming our gauge should quot only date company name est annual usage rfq start production part number rev level vehicle model program life returned by currencyrate fob point mfg location stampingcasting material typegrade pcs per cycle thickness mm width length blank weight lb scrap net total molding spec volume given cubic inches density lbsin minimum requirement partsrun ro flow calculate grs wtlbs if wt not known leave value run flows parts components description pcsassembly pc component processing labor equipment operation stations machine size strokes hr pieceshr subtotal process efficiency pa...

no reviews yet
Please Login to review.