sheet 1 sch a cost summary schedule a general contractor s cost summary general contractor 0 project name 0 project location 0 development nondepreciable noneligible eligible basis for cost costs ...

icon picture XLSX Filetype Excel XLSX | Posted on 14 Aug 2022 | 3 years ago
Partial file snippet.
Sheet 1: SCH A COST SUMMARY

















SCHEDULE A:














GENERAL CONTRACTOR'S COST SUMMARY





























General Contractor: 0











Project Name: 0












Project Location 0
































































Development
Non-Depreciable
Non-Eligible
Eligible Basis for








Cost
Costs
Costs
Rehab / NC




















CONSTRUCTION














Demolition


$0




$0




Off-Site Improvements


$0




$0




Site Work


$0




$0




Residential Structures


$0




$0




Environmental Clearances


$0




$0




Surety & Bonding


$0




$0




Building Permits


$0




$0




Community Service Facility


$0




$0




Garage Parking


$0




$0




Fire Suppression System


$0




$0




Green Features


$0




$0




Other:


$0




$0




















CONTRACTOR FEE














Contractor Overhead & Profit








$0




General Requirements








$0




































TOTAL CONSTRUCTION COSTS


$0
$0
$0
$0



































Notes:














This Schedule must match Schedule C: Breakdown of Costs and Basis in the Developer's Cost Certification.



If there is more than one general contractor, a separate General Contractor’s Cost Certification is required from each general contractor.















Sheet 2: SCH B TRADE PAYMENT
SCHEDULE B:


GENERAL CONTRACTOR'S TRADE PAYMENT BREAKDOWN






Instructions: Itemize all actual construction costs below by payee, including any approved change orders/ accepted cost increases. Insert additional lines as necessary.








CATEGORY TRADE/ DESCRIPTION OF WORK COST PAYEE/ SUBCONTRACTOR
Residential Structures Concrete


Masonry


Metals


Rough Carpentry


Finish Carpentry


Moisture Protection


Insulation


Roofing


Sheet Metal


Siding


Doors & Hardware


Windows & Glazing


Acoustical Tile


Drywall


Ceramic Tile


Wood Flooring


Resilient Flooring


Painting and Decorating


Carpet


Unit AC and/or Sleeves


Cabinets & Vanities


Appliances


Window Treatments


Elevators


Plumbing


HVAC


Electrical


Other (specify)


Other (specify)


Other (specify)


Other (specify)


Other (specify)


Other (specify)


TOTAL RESIDENTIAL STRUCTURES $0




CATEGORY TRADE/ DESCRIPTION OF WORK COST PAYEE/ SUBCONTRACTOR
Site Work Earthwork


Site Utilities


Roads & Walks


Site Improvements


Landscaping


Other (specify)


Other (specify)


TOTAL SITE WORK $0




CATEGORY TRADE/ DESCRIPTION OF WORK COST PAYEE/ SUBCONTRACTOR
Demolition


Off-Site Improvements


Environmental Clearances


Surety & Bonding


Building Permits


Community Service Facility


Garage Parking


Fire Suppression System


Green Features


Other:



TOTALS $0








Note: This audit must include a sampling of subcontractor invoices in order to verify consistency with the developer’s cost certification.



The words contained in this file might help you see if this file matches what you are looking for:

...Sheet sch a cost summary schedule general contractor s project name location development nondepreciable noneligible eligible basis for costs rehab nc construction demolition offsite improvements site work residential structures environmental clearances surety amp bonding building permits community service facility garage parking fire suppression system green features other fee overhead profit requirements total notes this must match c breakdown of and in the developer certification if there is more than one separate rsquo required from each b trade payment instructions itemize all actual below by payee including any approved change orders accepted increases insert additional lines as necessary category description subcontractor concrete masonry metals rough carpentry finish moisture protection insulation roofing metal siding doors hardware windows glazing acoustical tile drywall ceramic wood flooring resilient painting decorating carpet unit ac andor sleeves cabinets vanities appliance...

no reviews yet
Please Login to review.