Cost Sheet Format In Excel 40081 | Template Cost Proposal Draft (050416)
proposal solar photovoltaics cost proposal steps for customizing template the intention of the cost proposal template is to ensure all bidders submit requested pricing in the same format this will allow  ...

icon picture XLSX Filetype Excel XLSX | Posted on 14 Aug 2022 | 3 years ago
Partial file snippet.
Sheet 1: Instructions
REQUEST FOR PROPOSAL: SOLAR PHOTOVOLTAICS COST PROPOSAL

STEPS FOR CUSTOMIZING TEMPLATE
The intention of the cost proposal template is to ensure all bidders submit requested pricing in the same format. This will allow building owners the ability to compare bids across responses.

























Step 1: All "orange" cells should be filled out by the building owner issuing the RFP.
Step 2: Customize Price Proposal Tab to include only the pricing structures (e.g. PPA, Lease, Direct Purchase) and additional bid adders requested.
Step 3: On the Price Proposal Tab, designate the annual escalation rate you would like respondents to assume when providing PPA and/or lease pricing.
Step 4: If requesting a direct purchase, indicate the number of panel washings requested per year.
Step 5: Request a separate NPV Cash Flow for each financing structure by creating a separate tab for each (e.g. PPA, Lease, Direct Purchase).
Step 6: On the 'NPV Cash Flow' tab, include discount rate, energy escalation rate and avoided cost of electricity. The building owner can request the avoided cost of electricity, if calculated the NPV will be difficult to compare across responses.
Step 7: All "yellow" cells should be filled out by the bidder.
Step 8: Delete Instructions tab.

































Sheet 2: PriceProposal
REQUEST FOR PROPOSAL: SOLAR PHOTOVOLTAICS COST PROPOSAL












PRICE PROPOSALTEMPLATE





Proposer: Please fill out ALL yellow cells and do not modify the template format.



































PROPOSER:

























































Client Name




























Location (Site Name & Address)




























System Size (W DC)


























































PPA PRICE per kWh





























Initial Payment (if applicable) Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19 Year 20 Buyout after yr. 20 Notes





Payment ($/kWh) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 FMV ($)






Annual Escalation Rate
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%









*Monitoring and O&M should be included in PPA price.

























































LEASE PRICE per month





























Initial Payment (if applicable) Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19 Year 20 Buyout after yr. 20 Notes





Payment ($/month) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 FMV ($)






Annual Escalation Rate
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%









*Monitoring and O&M should be included in lease price.

























































Direct Purchase Price





























Purchase Price Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19 Year 20 $/Wdc Notes





Full System Price (before Incentives) $0.00 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA #DIV/0!






Annual Price for Proposed O&M
$- $- $- $- $- $- $- $- $- $- $- $- $- $- $- $- $- $- $- $-







Annual Price - Panel Washing (0-2x per year)
$- $- $- $- $- $- $- $- $- $- $- $- $- $- $- $- $- $- $- $-







Monitoring Equipment Upfront Price $0.00 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA #DIV/0!




































Additional Bid Adders





























Total Cost



























Energy Storage $0.00



























Vehicle Charging Stations $0.00



























Fence $0.00

























































Production Data





























Size (kW DC) Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19 Year 20 Notes






Expected Production - - - - - - - - - - - - - - - - - - - - -







Guaranteed Production - - - - - - - - - - - - - - - - - - - - -









Annual Degradation Rate: 0.0%




























































































The words contained in this file might help you see if this file matches what you are looking for:

...Sheet instructions request for proposal solar photovoltaics cost steps customizing template the intention of is to ensure all bidders submit requested pricing in same format this will allow building owners ability compare bids across responses step quot orange cells should be filled out by owner issuing rfp customize price tab include only structures eg ppa lease direct purchase and additional bid adders on designate annual escalation rate you would like respondents assume when providing andor if requesting a indicate number panel washings per year separate npv cash flow each financing structure creating discount energy avoided electricity can calculated difficult yellow bidder delete priceproposal proposaltemplate proposer please fill do not modify client name location site amp address system size w dc kwh initial payment applicable buyout after yr notes fmv monitoring o m included month wdc full before incentives na div proposed washing x equipment upfront total storage vehicle charg...

no reviews yet
Please Login to review.