Authentication
522x Tipe PPT Ukuran file 0.31 MB Source: sisfo.unisla.ac.idË61
ANGGARAN BIAYA TENAGA
KERJA LANGSUNG
TK. LANGSUNG
TENAGA KERJA
TK. TIDAK LANGSUNG
TK. LANGSUNG : ADALAH T.K. YANG SECARA LANGSUNG
BERPERAN DALAM PROSES PRODUKSI MEMILIKI CICIR SBB:
• BESAR KECILNYA BERHUBUNGAN SECARA LANGSUNG
DENGAN TINGKAT KEGIATAN PRODUKSI.
• MASUK BIAYA VARIABEL
• KEGIATAN TK LANGSUNG DIHUBUNGKAN DENGAN
PRODUK AKHIR.
• PENENTU HARGA POKOK PRODUK.
T.K. TIDAK LANGSUNG, SECARA TIDAK LANGSUNG
BERPERAN DALAM PROSES PRODUKSI, MASUK KE
DALAM BIAYA OVERHEAD PABRIK.
ANGGARAN TENAGA KERJA ADALAH ANGGARAN YANG
MERENCANAKAN SECARA TERPERINCI TENTANG UPAH YANG
AKAN DIBAYARKAN KEPADA T.K. LANGSUNG UNTUK PERIODE
YAD.
PENYUSUNAN ANGGARAN T. KERJA
1. ANGGARAN JAM KERJA LANGSUNG
2. ANGGARAN BIAYA T.K.L.
FAKTOR YANG PERLU DIPERTIMBANGKAN DALAM MENYUSUN
ANGGARAN T.K.
1. ANGGARAN UNIT YANG HARUS DIPRODUKSI
2. STANDAR WAKTU YANG DIGUNAKAN
3. SISTEM PEMBAYARAN UPAH ATAS DASAR WAKTU,
OUTPUT, INSENTIF
MANFAAT
1) PENGGUNAAN T.K. LEBIH EFISIEN
2) PENGELUARAN BIAYA T.K. EFISIEN
3) HARGA POKOK DIHITUNG TEPAT
4) ALAT PENGAWASAN BIAYA T.K.
CONTOH :
PERUSAHAAN “X” MEMPERSIAPKAN PENYUSUNAN ANGGARAN T.K.
UNTUK TAHUN 2009 DATA YANG TERSEDIA.
A) RENCANA PRODUKSI
TRIWULAN JUMLAH (unit)
TRIWULAN JUMLAH (unit)
1 5000
1 5000
2 4000
2 4000
3 6000
3 6000
4 8000
4 8000
B) RENCANA JAM T.K.L. PER UNIT PRODUK, DEPT. 1,
STANDAR JAM : 2,4 DEPT. 2, STANDAR JAM : 1,5
C) RENCANA TINGKAT UPAH/JAM
DEPT TARIF/DLH
DEPT TARIF/DLH
1 Rp 500
1 Rp 500
2 Rp 700
2 Rp 700
DITANYAKAN :
1. ANGGARAN JAM KERJA LANGSUNG
2. ANGGARAN BIAYA T.K.LANGSUNG
1. ANGGARAN JAM KERJA LANGSUNG
DEPT. 1 DEPT. 2
DEPT. 1 DEPT. 2
TRI
TRI PROD TOTAL
PROD STD JML STD JML TOTAL
WULAN STD JML STD JML
WULAN
1 5.000 2,4 12.00 1,5 7.500 19.500
1 5.000 2,4 12.00 1,5 7.500 19.500
0
0
2 4.000 2,4 9.600 1,5 6.000 15.600
2 4.000 2,4 9.600 1,5 6.000 15.600
3 6.000 2,4 14.40 1,5 9.000 23.400
3 6.000 2,4 14.40 1,5 9.000 23.400
0
0
4 8.000 2,4 19.20 1,5 12.00 31.200
4 8.000 2,4 19.20 1,5 12.00 31.200
0 0
0 0
JUMLAH 23.00 55.20 34.50 89.700
JUMLAH 23.00 55.20 34.50 89.700
0 0 0
0 0 0
DITANYAKAN :
2. ANGGARAN BIAYA T. KERJA LANGSUNG
DEPT. 1 DEPT. 2
DEPT. 1 DEPT. 2
JML.
TRI JML. JUMLAH
TRI JML JUMLAH
JML UPAH (ribua
WULAN UPAH (ribua (Rp)
WULAN JAM UPAH (ribuan JAM (Rp)
JAM UPAH (ribuan JAM (Rp) n0
). (rp) (Rp) n0
). (rp) (Rp)
(Rp)
1 12.00 Rp 500 6.000 7.500 700 5.250 (dep1+D
1 12.00 Rp 500 6.000 7.500 700 5.250 (dep1+D
0 ep 2)
0 ep 2)
2 9.600 4.800 6.000 4.200
2 9.600 4.800 6.000 4.200
3 14.40 7.200 9.000 6.300
3 14.40 7.200 9.000 6.300
0
0
4 12.20 9.600 12.000 8.400
4 12.20 9.600 12.000 8.400
0
0
no reviews yet
Please Login to review.