Sheet 1: Rekap (2)
| PERUSAHAAN DAERAH AIR MINUM | ||||||||
| KOTA MALANG | ||||||||
| REKAPITULASI RENCANA ANGGARAN BIAYA | ||||||||
| PEKERJAAN | : | Rencana Pembuatan Interkoneksi WaterTank Ø 200 | ||||||
| Pipa PE PN 12.5 Sepanjang 400 meter | ||||||||
| L O K A S I | : | Tandon Air Buring Tengah | ||||||
| Kota Malang | ||||||||
| No. | URAIAN PEKERJAAN | J U M L A H | ||||||
| 1 | 2 | 3 | ||||||
| I. | PEKERJAAN PERSIAPAN : | Rp. | 185,211.11 | |||||
| II. | PEKERJAAN TANAH : | Rp. | 4,051,120.33 | |||||
| III. | PEKERJAAN PASANGAN : | Rp. | 238,058.70 | |||||
| IV. | PEKERJAAN PIPA : | |||||||
| 1. Bahan | ||||||||
| a. | PE PN 12.5 | Rp. | PDAM | |||||
| b. | Accesories untuk Jaringan : | Rp. | PDAM | |||||
| 2. Upah | ||||||||
| a. | Pemasangan Pipa dan Valve | Rp. | 8,313,896.50 | |||||
| VI. | PEKERJAAN PENYELESAIAN : | Rp. | 469,744.00 | |||||
| J u m l a h | Rp. | 13,258,030.64 | ||||||
| Dibulatkan | Rp. | 13,258,000.00 | ||||||
| Terbilang : ( Tiga belas juta dua ratus lima puluh delapan ribu rupiah ) | ||||||||
| Keterangan : | ||||||||
| - | Biaya tersebut diatas berdasarkan Analisa SNI | |||||||
| - | Biaya tersebut diatas belum termasuk PPn 10 % | |||||||
| Malang, ................................. | ||||||||
| Dibuat oleh, | ||||||||
| Manajer Perencanaan Teknik | ||||||||
| ISWAGIANTONO, ST | ||||||||
| NPP. 03920283 | ||||||||
| Mengetahui, | Mengetahui, | |||||||
| Direktur Adm. & Keuangan | Direktur Teknik | |||||||
| ANITA SARI. SH, MH | Ir. H. TEGUH CAHYONO. MAB. | |||||||
| Disetujui, | ||||||||
| Untuk Dilaksanakan | ||||||||
| Direktur Utama | ||||||||
| H. M JEMIANTO. | ||||||||
| PERUSAHAAN DAERAH AIR MINUM | ||||||||
| KOTA MALANG | ||||||||
| REKAPITULASI RENCANA ANGGARAN BIAYA | ||||||||
| PEKERJAAN | : | Rencana Pembuatan Interkoneksi WaterTank Ø 200 | ||||||
| Pipa PE PN 12.5 Sepanjang 400 meter | ||||||||
| L O K A S I | : | Tandon Air Buring Tengah | ||||||
| Kota Malang | ||||||||
| No. | URAIAN PEKERJAAN | J U M L A H | ||||||
| 1 | 2 | 3 | ||||||
| I. | PEKERJAAN PERSIAPAN : | Rp. | 185,211.11 | |||||
| II. | PEKERJAAN TANAH : | Rp. | 4,051,120.33 | |||||
| III. | PEKERJAAN PASANGAN : | Rp. | 238,058.70 | |||||
| IV. | PEKERJAAN PIPA : | |||||||
| 1. Bahan | ||||||||
| a. | PE PN 12.5 | Rp. | 256,141,800.00 | |||||
| b. | Accesories untuk Jaringan : | Rp. | 62,253,041.00 | |||||
| 2. Upah | ||||||||
| a. | Pemasangan Pipa dan Valve | Rp. | 8,313,896.50 | |||||
| VI. | PEKERJAAN PENYELESAIAN : | Rp. | 469,744.00 | |||||
| J u m l a h | Rp. | 331,652,871.64 | ||||||
| PPn 10 % | Rp. | 33,165,287.16 | ||||||
| Jumlah Total | Rp. | 364,818,158.80 | ||||||
| Dibulatkan | Rp. | 364,818,000.00 | ||||||
| Terbilang : ( Tiga ratus enam puluh empat juta delapan ratus delapan belas ribu rupiah ) | ||||||||
| Keterangan : | ||||||||
| - | Biaya tersebut diatas berdasarkan Analisa SNI | |||||||
| - | Biaya tersebut diatas sudah termasuk PPn 10 % | |||||||
| Malang, ................................. | ||||||||
| Dibuat oleh, | ||||||||
| Manajer Perencanaan Teknik | ||||||||
| ISWAGIANTONO, ST | ||||||||
| NPP. 03920283 | ||||||||
| Mengetahui, | Mengetahui, | |||||||
| Direktur Adm. & Keuangan | Direktur Teknik | |||||||
| ANITA SARI. SH, MH | Ir. H. TEGUH CAHYONO. MAB. | |||||||
| Disetujui, | ||||||||
| Untuk Dilaksanakan | ||||||||
| Direktur Utama | ||||||||
| H. M JEMIANTO. | ||||||||
| PERUSAHAAN DAERAH AIR MINUM | ||||||||||||
| KOTA MALANG | ||||||||||||
| RENCANA ANGGARAN BIAYA | ||||||||||||
| PEKERJAAN | : | Rencana Pembuatan Interkoneksi WaterTank Ø 200 | ||||||||||
| Pipa PE PN 12.5 Sepanjang 400 meter | ||||||||||||
| L O K A S I | : | Tandon Air Buring Tengah | ||||||||||
| Kota Malang | ||||||||||||
| HARGA ( Rp. ) | ||||||||||||
| No. | URAIAN PEKERJAAN | SATUAN | VOLUME | ANALISA | SATUAN | JML. HARGA | JML. HARGA | |||||
| SATUAN | SELURUH | |||||||||||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | |||||
| I. | PEKERJAAN PERSIAPAN : | |||||||||||
| Uit Set | km | 0.40 | : A.19 | 463,027.76 | 185,211.11 | |||||||
| 185,211.11 | ||||||||||||
| II. | PEKERJAAN TANAH : | |||||||||||
| Galian Tanah Biasa | m3 | 70.00 | : B.01 | 37,437.50 | 2,620,625.00 | |||||||
| Urugan Tanah | m3 | 57.44 | : B.10 | 24,904.17 | 1,430,495.33 | |||||||
| 4,051,120.33 | ||||||||||||
| III. | PEKERJAAN PASANGAN : | |||||||||||
| Pembuatan Thrust Block | m3 | 0.21 | : G.07 | 1,151,411.76 | 238,058.70 | |||||||
| 238,058.70 | ||||||||||||
| IV. | PEKERJAAN PIPA : | |||||||||||
| 1. | Bahan | |||||||||||
| a. | PE PN 12.5 | |||||||||||
| Pipa PE PN 12.5 Ø 200 | m' | 400.00 | pas | PDAM | PDAM | |||||||
| PDAM | ||||||||||||
| b. | Accesories untuk Jaringan : | |||||||||||
| Flange Adaptor Universal Ø 8" DCI | buah | 6.00 | pas | PDAM | PDAM | |||||||
| Valve Resilient ( setara AVK ) PN 16 Ø 8" | buah | 1.00 | pas | PDAM | PDAM | |||||||
| All Flange Bend Ø 8" 45° PN 16 DCI | buah | 4.00 | pas | PDAM | PDAM | |||||||
| All Flange Tee Ø 8" PN 16 DCI | buah | 4.00 | pas | PDAM | PDAM | |||||||
| Stratpot Ø 6" | buah | 1.00 | pas | PDAM | PDAM | |||||||
| Pak Karet Ø 8" EPDM | buah | 11.00 | pas | PDAM | PDAM | |||||||
| Baut Mur | buah | 88.00 | pas | PDAM | PDAM | |||||||
| PDAM | ||||||||||||
| 2. | Upah | |||||||||||
| a | Pemasangan Pipa dan Valve | |||||||||||
| Pipa PE PN 12.5 Ø 200 | m' | 400.00 | : R.117 | 20,243.63 | 8,097,450.00 | |||||||
| Valve Resilient ( setara AVK ) PN 16 Ø 8" | buah | 1.00 | : R.107 | 166,900.00 | 166,900.00 | |||||||
| Stratpot Ø 6" | buah | 1.00 | : R.89 | 49,546.50 | 49,546.50 | |||||||
| 8,313,896.50 | ||||||||||||
| VI. | PEKERJAAN PENYELESAIAN : | |||||||||||
| 1 | Pembersihan Lokasi dan pembuangan | |||||||||||
| Bekas Galian | m3 | 12.56 | : B.09 SP | 37,400.00 | 469,744.00 | |||||||
| 469,744.00 | ||||||||||||
| c | Biaya Tapping | |||||||||||
| Pipa PE PN 12.5 Ø 63 | titik | - | : R.158 | 190,490.57 | 0.00 | |||||||
| Pipa PE PN 12.5 Ø 90 | titik | - | : R.159 | 222,534.57 | 0.00 | |||||||
| Pipa PE PN 12.5 Ø 110 | titik | - | : R.160 | 293,468.21 | 0.00 | |||||||
| Pipa PE PN 12.5 Ø 160 | titik | - | : R.161 | 395,248.71 | 0.00 | |||||||
| Pipa PE PN 12.5 Ø 200 | titik | - | : R.162 | 547,002.43 | 0.00 | |||||||
| Pipa PE PN 12.5 Ø 250 | titik | - | : R.163 | 786,585.13 | 0.00 | |||||||
| Pipa PE PN 12.5 Ø 315 | titik | - | : R.164 | 1,237,567.53 | 0.00 | |||||||
| 0.00 | ||||||||||||
| c | Biaya Tapping ( Penyambungan ) | |||||||||||
| Pipa PE PN 12.5 Ø 63 | titik | - | : R.235 | 19,225.00 | 0.00 | |||||||
| Pipa PE PN 12.5 Ø 90 | titik | - | : R.236 | 22,425.00 | 0.00 | |||||||
| Pipa PE PN 12.5 Ø 110 | titik | - | : R.237 | 25,625.00 | 0.00 | |||||||
| Pipa PE PN 12.5 Ø 160 | titik | - | : R.238 | 32,025.00 | 0.00 | |||||||
| Pipa PE PN 12.5 Ø 200 | titik | - | : R.239 | 33,625.00 | 0.00 | |||||||
| Pipa PE PN 12.5 Ø 250 | titik | - | : R.240 | 36,146.88 | 0.00 | |||||||
| Pipa PE PN 12.5 Ø 315 | titik | - | : R.241 | 38,857.89 | 0.00 | |||||||
| 0.00 | ||||||||||||
| c | Biaya Pengeboran Jalan | |||||||||||
| Bor Crossing Jalan Ø 2" | m | - | : B.18 | 119,106.25 | 0.00 | |||||||
| Bor Crossing Jalan Ø 3" | m | - | : B.19 | 151,931.25 | 0.00 | |||||||
| Bor Crossing Jalan Ø 4" | m | - | : B.20 | 205,312.50 | 0.00 | |||||||
| Bor Crossing Jalan Ø 6" | m | - | : B.21 | 307,968.75 | 0.00 | |||||||
| Bor Crossing Jalan Ø 8" | m | - | : B.22 | 410,625.00 | 0.00 | |||||||
| Bor Crossing Jalan Ø 10" | m | - | : B.23 | 509,175.00 | 0.00 | |||||||
| Bor Crossing Jalan Ø 12" | m | - | : B.24 | 615,937.50 | 0.00 | |||||||
| 0.00 | ||||||||||||