Gujarat State Road Transport Bus Port Form 1A
Corporation (GSRTC)
APPENDIX II
FORM-1 A
CHECK LIST OF ENVIRONMENTAL IMPACTS
(Project proponents are required to provide full information and wherever necessary attach explanatory
notes with the Form and submit along with proposed environmental management plan & monitoring
programme)
S. Item Remark
No.
1. LAND ENVIRONMENT
1.1 Will the existing land use get significantly No , the existing land will not get altered.
altered from the project that is not
consistent with the surroundings? The proposed project is the construction of Bus
(Proposed land use must conform to the port.
approved Master Plan / Development
Plan of the area. Change of land use if The project will be developed as per local landuse
any and the statutory approval from the plan.
competent authority be submitted).
Attach Maps of (i) site location, (ii) surrounding features of the proposed site (within
surrounding features of the proposed site 500 meters) is provided in Annexure 3
(within 500 meters) and (iii) the site
(indicating levels & contours) to
appropriate scales. If not available attach
only conceptual plans.
1.2 List out all the major project requirements Site lay-out plan is provided in Annexure 4.
in terms of the land area, built up area, Major requirements are
water consumption, power requirement,
connectivity, community facilities, parking 2
needs etc. Plot area in m 22,024
Built-up area in 57,211
2
m
Floor Area in 32,642
2
m,FSI
Ground Coverage 8290
2
in m
No. of floors G+ 7 Floors
Maximum height 29.55
in m
Basement area in 20,673
2
m
Water 263.34
requirement in
KLD
Power 4000 KVA
requirement
Proposed project is connected by 12 m and 30 m
wide roads.
2
1.3 What are the likely impacts of the About 5399.8 m area will be developed as green
proposed activity on the existing facilities and will have positive impact on the surrounding.
adjacent to the proposed site? (Such as No rare or endangered species of fauna are
open spaces, community facilities, details reported to exist in the area. Care will be taken to
of the existing land use, disturbance to minimize the disturbance to the local ecology.
the local ecology)
1.4 Will there be any significant land There is no land disturbance due to the project.
disturbance resulting in erosion,
1
Gujarat State Road Transport Bus Port Form 1A
Corporation (GSRTC)
S. Item Remark
No.
subsidence & instability? (Details of soil The Project area is categorized in the seismic zone
type, slope analysis, vulnerability to III. The structural Design of the building is as per
subsidence, seismicity etc may be given). Codes to negate the threat of environmental and
other damages.
1.5 Will the proposal involve alteration of No natural drainage is passing through project
natural drainage systems? (Give details area. Moreover plot area is almost flat.
on a contour map showing the natural
drainage near the proposed project site)
3
1.6 What are the quantities of earthwork ~1,20,000 m excavated earth will be generated.
involved in the construction activity - Top soil will be preserved and use for landscaping
cutting, filling, reclamation etc. (Give purpose. Other earth will be used in backfilling.
details of the quantities of earthwork Balance earth shall be disposed at low lying area
involved, transport of fill materials from designated by BAUDA.
outside the site etc.)
1.7 Give details regarding water supply, During construction period water will be supplied
waste handling etc during the by tankers.
construction period. Onsite sanitation facilities will be provided for the
workers with required arrangements as per
building and other construction workers
(Regulation of Employment and Conditions of
Service) Act.
1.8 Will the low-lying areas & wetlands get No wetland and low-lying areas are found in the
altered? (Provide details of how low lying vicinity of the project.
and wetlands are getting modified from
the proposed activity)
1.9 Whether construction debris & waste Solid waste during the construction phase
during construction cause health hazard? comprised mainly of excavated, concrete debris,
(Give quantities of various types of steel scrap, insulation material for air-conditioning
wastes generated during construction and packaging material.
including the construction labour and the
means of disposal) Top soil will be preserved and later used for green
belt. The excavated soil will be use for backfilling.
The construction waste will be well managed
without causing any health hazard.
2. WATER ENVIRONMENT
2.1 Give the total quantity of water Total Fresh Water requirement for the project is
requirement for the proposed project with 135 KLD.
the breakup of requirements for various The details of water requirement & its breakup
uses. How will the water requirement water demand for the construction & operation
met? State the sources & quantities and phase is provided in Annexure 5
furnish a water balance statement
2.2 What is the capacity (dependable flow or Freshwater during operation phase shall be
yield) of the proposed source of water? provided by BAUDA.
2.3 What is the quality of water required, in Normally source of water supply will be met from
case, the supply is not from a municipal BAUDA.
source? (Provide physical, chemical,
biological characteristics with class of
water quality)
2.4 How much of the water requirement can Wastewater will be collected and treated in
be met from the recycling of treated sewage treatment plant and will be used for
wastewater? (Give the details of flushing, horticulture. About 128.34 KLD of treated
quantities, sources and usage) waste water will be used. Water break up is
attached wide
Annexure 5
2.5 Will there be diversion of water from There will be no diversion from other users since
other users? (Please assess the impacts the water demand is being met as a part of the
2
Gujarat State Road Transport Bus Port Form 1A
Corporation (GSRTC)
S. Item Remark
No.
of the project on other existing uses and proposed project.
quantities of consumption)
2.6 What is the incremental pollution load Maximum 183.6 KLD wastewater will be generated
from wastewater generated from the from the proposed project. Break up of water is
proposed activity? (Give details of the attached vide Annexure 5.
quantities and composition of wastewater
generated from the proposed activity)
2.7 Give details of the water requirements No
met from water harvesting? Furnish
details of the facilities created.
2.8 What would be the impact of the land use Rain water harvesting details are provided in
changes occurring due to the proposed Annexure 6
project on the runoff characteristics
(quantitative as well as qualitative) of the
area in the post construction phase on a
long-term basis? Would it aggravate the
problems of flooding or water logging in
any way?
2.9 What are the impacts of the proposal on No
the ground water? (Will there be tapping
of ground water; give the details of
ground water table, recharging capacity,
and approvals obtained from competent
authority, if any)
2.10 What precautions/measures are taken to During construction phase, on-site sanitation
prevent the run-off from construction facilities will be provided and domestic wastewater
activities polluting land & aquifers? (Give will be disposed into soak pit
details of quantities and the measures No run off will be disposed outside the project
taken to avoid the adverse impacts) boundary.
2.11 How is the storm water from within the During the post-construction stages, storm water
site managed? (State the provisions will be collected into the surface drainage network
made to avoid flooding of the area, inside the premises. The drain sizes and sections
details of the drainage facilities provided will be designed in such a way that they can take
along with a site layout indication contour the load of the peak rainfall period. All the surface
levels) drains will be covered by gratings Proper surface
gradient will be provided so that water logging
inside the campus does not occur.
Collected rain water will be recharged into ground
water. Details are provided in Annexure 6.
2.12 Will the deployment of construction The construction labourers will be hired from local
labourers particularly in the peak period area. During construction phase, on-site sanitation
lead to unsanitary conditions around the facilities will be provided. All the basic facilities will
project site (Justify with proper be provided to labour.
explanation)
2.13 What on-site facilities are provided for the During the Construction phase, on-site sanitation
collection, treatment & safe disposal of facilities will be provided ( Septic tank and soak pit)
sewage? (Give details of the quantities of During the operation phase, the total wastewater
wastewater generation, treatment generation is estimated to be 183.6 KLD The
capacities with technology & facilities for wastewater will be treated into sewage treatment
recycling and disposal) plant.
2.14 Give details of dual plumbing system if Yes the dual plumbing system will be provided
treated waste used is used for flushing of which will use treated water for flushing the toilets
toilets or any other use.
3. VEGETATION
3.1 Is there any threat of the project to the No.
biodiversity? (Give a description of the
3
Gujarat State Road Transport Bus Port Form 1A
Corporation (GSRTC)
S. Item Remark
No.
local ecosystem with it’s unique features,
if any)
3.2 Will the construction involve extensive There are no endangered or significant flora fauna
clearing or modification of vegetation? nearby site.
(Provide a detailed account of the trees &
vegetation affected by the project)
3.3 What are the measures proposed to be 331 numbers of local trees will be planted and
taken to minimize the likely impacts on common area will be developed as green area.
important site features (Give details of
proposal for tree plantation, landscaping,
creation of water bodies etc along with a
layout plan to an appropriate scale)
4. FAUNA
4.1 Is there likely to be any displacement of No scope of displacement of terrestrial as well as
fauna- both terrestrial and aquatic or aquatic fauna is involved due to the proposed
creation of barriers for their movement? construction.
Provide the details.
4.2 Any direct or indirect impacts on the No direct and indirect adverse impact is envisaged
avifauna of the area? Provide details. to fauna due to the project
.3 Prescribe measures such as corridors, Not applicable
fish ladders etc to mitigate adverse
impacts on fauna
5. AIR ENVIRONMENT
5.1 Will the project increase atmospheric No. Air Emissions will be generated from vehicular
concentration of gases & result in heat movement and DG sets in case of power failure.
islands? (Give details of background air
quality levels with predicted values based
on dispersion models taking into account
the increased traffic generation as a
result of the proposed constructions)
5.2 What are the impacts on generation of Proposed project facilities will not involve
dust, smoke, odorous fumes or other continuous emission during operation phase,
hazardous gases? Give details in relation hence minor impact envisaged during operation
to all the meteorological parameters. phase. Emission will occur from stand by DG set.
5.3 Will the proposal create shortage of
parking space for vehicles? Furnish Parking Details are provided in Annexure 7
details of the present level of transport
infrastructure and measures proposed for
improvement including the traffic
management at the entry & exit to the
project site.
5.4 Provide details of the movement patterns Minimum 4.5m wide internal circulation will be
with internal roads, bicycle tracks, provided.
pedestrian pathways, footpaths etc., with
areas under each category.
5.5 Will there be significant increase in traffic Minimum increase in noise due to vehicular
noise & vibrations? Give details of the movement on the surrounding area. During the
sources and the measures proposed for project stage, Proper signage and trained staff will
mitigation of the above. be provided for traffic control.
5.6 What will be the impact of DG sets & It is proposed to install stand by silent DG set so