2013 international conference on advances in social science humanities and management asshm 2013 research on construction site management of green and sustainability 1 2 shao junyi cheng liangjian abstract a ...

icon picture PDF Filetype PDF | Posted on 13 Sep 2022 | 3 years ago
Partial capture of text on file.
                          2013 International Conference on Advances in Social Science, Humanities, and Management (ASSHM 2013)
                                                                            
                Research  on  construction  site  management  of  green 
                                                            and sustainability   
                                                                     1                        2
                                                        Shao Junyi    Cheng Liangjian  
                Abstract:                                                      a  good  job  quality,  schedule,  cost,  safety  and  other 
                  Integrating the development of sustainable green ideas       specific  goals   while    considering    environmental 
                into the construction site management, for the problems        protection,  resource  conservation  and  sustainable 
                and deficiencies of the construction site, through the         development of corporate health and other macro goals.   
                establishment  of  a system  of green  construction site       2.  green construction site management  framework 
                management  framework,  strengthen  and  improve  the          Establishment   
                construction  site  management,  propose  effective               Construction  enterprises  should  be  based  on  the 
                measure for improvement and perfect.                           construction of green enterprises are facing the situation 
                Keywords:  Construction  site  management   Green              and sustainable development needs, formulate a certain 
                Sustainable                                                    period of Green construction site management overall 
                1.  A  development  status  of  the  construction  site        goal to be achieved, according to the construction site 
                management                                                     management personnel,  materials,  machinery,  quality, 
                    Economic  development  of  the  green  trend  will         schedule, cost, etc. were asked to develop several major 
                inevitably    affect   the    construction     enterprise      aspects  of  green  construction  management  sub-goals 
                management  and  future  development  prospects.               and then layers of implementation, subordinate officers 
                Construction  industry  as  an  energy  resource  guzzler,     of  various  departments  as  well  as  each  employee 
                tight resource constraints faced serious environmental         according to the higher formulate goals and assurance 
                pollution, ecosystem degradation of the grim situation,        measures,  forming  a  target  system  and  the  target 
                it must be green and sustainable development concept           completion as a basis for assessment. Establishment of 
                of  fully  integrated  into  the  construction  project        management  system  through  the  target  of  target 
                management,  construction  site  management  is  an            segments,  work  breakdown  achieve  clear  division  of 
                important  aspect  of  the  construction  industry  green      responsibility clear results, and thus more conducive to 
                environmental protection and sustainable development           environmental protection and sustainable development 
                has an important influence.                                    goals.   
                    In recent years, gradually improve the management 
                of  the  construction  site  but  there  are  still  many 
                loopholes  and  problems  in  the  construction  site 
                management practice, some construction companies lax 
                management,  site  management  confusion,  rules  and 
                regulations  do  not  perform,  construction  unplanned, 
                operating  without  standards  ;  worker  discipline 
                relaxation,  production  efficiency  is  low;  variety  of 
                materials,  tools,  equipment,  no  special  management,                                                                
                littered the scene environment is dirty, chaotic, and poor,    Figure  1-1  Green  construction  site  management 
                causing  environmental  pollution  waste  of  resources,       framework map 
                resulting  in  some  construction  project  construction          Through  the  establishment  of  green  construction 
                progress, quality control, security, site layout can not be    site  management  framework  from  green  personnel 
                implemented  as  planned,  is  not  conducive  to              management,  green  materials  management,  green 
                environmental protection and sustainable development           machines  management,  green  quality  management, 
                of  health  and  safety  of  construction  enterprises.        green schedule management, green cost management, 
                Therefore, a good construction site management will do         discovery and analysis of site management problems, 
                 
             © 2013. The authors - Published by Atlantis Press            389
                                                                                              
                   and propose appropriate solutions for the problem.                            construction  materials  powder  particles  covered  with 
                   2.1 Green construction site management                                        wet grass thatch, if the materials are to be stored dry 
                        Green  construction  is  the  building  in  the                          cloth replaced with rain wet grass thatch be covered to 
                   construction  process,  the  construction  side  in  strict                   prevent dust caused due to wind action. 
                   accordance with the planning, design requirements, the                           (2) the  specific  steps  are  as  follows  spray on  earth 
                   implementation  of  green  construction  principles  and                      heap  types  of  construction  materials  and  particles 
                   technical measures to minimize construction activities                        covered with grass thatch and grass thatch with the wet 
                   adverse  effects  on  the  environment,  reduce  resource                     sprinkler,      sprinkler 1.5m by          the      length       of 2 
                   and energy consumption.                                                       cm diameter PVC plastic  pipe  capped  at  one  end 
                        Green construction site management is the concept                        plugging  the  other  end  of  the  water  supply  hose 
                   of  environmental protection and into the construction                        and PVC plastic  pipe  to  form  a  plurality  of  equally 
                   site    management  among  construction  enterprises,                         spaced  holes. Formed  only  fine  uniform  spray  effect 
                   through  rational  and  effective  management  tool  for                      only the wet grass thatch achieve the effect of the mist, 
                   construction  site  management,  in  order  to  achieve                       without causing excessive water to form water. 
                   maximum  conservation  of  resources  (land,  energy,                            (3) vehicles entering and leaving the construction site 
                   water and materials) save manpower, and construction                          of the high-pressure water spray to remove the vehicle 
                   activities  to  minimize  the  adverse  impact  on  the                       tires and dust on the body. Establishment of a dedicated 
                   environment.                                                                  car wash station and sedimentation tanks, vehicles must 
                                                                                                 pass before the factory washing station cleaning, and 
                                                                                                 after cleaning and inspection personnel are responsible 
                                                                                                 for checking after passing appearance. 
                                                                                                                                                                         
                   Figure 1  -  2 Project  Management  Construction  Green                       Figure 1 – 3 Wash station 
                   Block Diagram                                                                       In  a  practical  application  of  engineering,  during 
                        Dust pollution is present at the construction site of                    spraying dust and vehicle cleaning while focusing on 
                   the more common problem of environmental pollution                            rationalizing  the  use  of  water  intensive. At  the 
                   caused by dust pollution sources, firstly of earth caused                     construction site built two pools, the excavation of the 
                   by construction dust;  Secondly construction materials                        foundation  is  able  to  get on  the 1st of  groundwater 
                   such  as  cement,  lime,  sand  granules,  powder,  wood                      seepage  ponds,  while  building  rainwater  collection 
                   processing,  etc.  due  to  the  formation  of  wind  action                  system  will  rainwater  catchment  basin  diversion 
                   dust; Thirdly Class earthworks and particulate powder                         into the 1st, the 1st of  water  through  sedimentation 
                   materials during transport caused by scatter.                                 pond Then after its drainage to the 2nd pool, so you can 
                       To  solve  these  problems  this  paper  proposes  the                    get used to flush into the appearance of the vehicle, dust 
                   following solutions:                                                          and water mix concrete, construction proved to achieve 
                       (1) basic engineering and earth earthworks produced                       a good water-saving effect. 
                   fixed  centrally  located,  immediately  after  the  excess                   2.2 Green personnel management 
                   tissue  in  the  production  of  earth  Sinotrans;  powder                    The green paper is based on personnel management and 
                   particles entering the new class of materials according                       construction engineering staffing needs to establish a 
                   to  the  construction  floorplan  fixed  focus stacking. On                   rational  system  in  the  full  implementation  of  all 
                   the  other  side  of  the  earth  fixed  focus,  types  of                    construction  management  responsibilities,  to  achieve 
                                                                                           390
                                                                                
                 the construction of safe, high quality, fast, efficient and       implementation of rectification. Second, set the green 
                 economical. Good  people  management  is  the  key  to            construction    supervisor    is   responsible    for   the 
                 achieve green construction management.                            construction site pollution factors and the high energy 
                      Meanwhile, workers at the construction site needs            factor   identification,   mobile    inspection,    correct 
                 to be improved in the presence of a series of problems,           violations,  and  was  found  contaminated  waste  and 
                 such  as  lack  of  awareness  of  green  construction,           report to assist construction personnel for rectification, 
                 personnel quality is not high; skill to master is not in          make on-site inspections, monitoring and rectification 
                 place,  the  lack  of  technical  training,  mature  new          records. 
                 technologies, new materials, new technology learning 
                 deficiencies, application not enough; Lack of building 
                 integrated work performance evaluation of employees, 
                 on the quality of work completed, work efficiency, lack 
                 of implementation of rules and regulations to comply 
                 with  quantitative  measurement;  health  and  safety 
                 management  of  personnel  shortage,  poor  working 
                 conditions, risk factors and more. 
                      To solve these problems this paper, the following                                                                            
                 measures:                                                              Figure 1 - 4 Green Management Flowchart 
                      1) our construction is labor intensive, employing            2.3 Green Materials Management 
                 quantity, the uneven quality of front-line workers in the              Green materials management is to plan material 
                 construction of migrant workers mainly lower levels of            requirements  as  the  basis  for  preparation,  and  then 
                 education. Specificme  asures:  ① increased  green                according  to  the  construction  drawings,  construction 
                 construction propaganda slogans        posted     at    the       schedule for procurement and storage, purchasing green 
                 construction site and set up billboards. ②  construction          building  materials,  according  to  a  fixed  amount  or 
                 team  held  regular  meetings  and  project  department           distributing materials engineering and on-site recycling 
                 meetings    to   discuss    the   bad    examples  exist          of  materials  and  working  materials  management, 
                 Construction  habits  and  learn  the  proper  methods  of        maximize the economical use of materials and avoid 
                 work  of  all,  get  rid  of  bad  work  habits. ③  establish     waste. 
                 civilized  construction  pacesetter,  pacesetter  play  an             Establish  a  complete  management  system  for 
                 exemplary role in the head, drive to improve the quality          building  materials  from  a  multi-stage,  multi-angle  to 
                 of all the staff.                                                 manage  for  building  materials  in  order  to  achieve 
                 2) to  carry  out  technical  training,  new  technologies,       efficient   resource    utilization  and    environmental 
                 new  processes  of  collective  learning  and  organize           protection conservation goals. 
                 regular  job  skills  assessment. Mix  of  old  and  new          Problem: 
                 personnel, advanced driving backward, mentoring type              (1) urgently  material  supply  disruptions,  inflow  of 
                 culture  learning,  construction  teams  quickly  improve         substandard quality materials applied to the project. 
                 the overall level of technology.                                  (2) Materials  custody  issues,  disordered  stacking, 
                 3) construction        environmental         optimization,        moisture, fire, security measures are not in place. 
                 construction site safety hazard inspection                        (3) material  waste problem,  need to create more than 
                 4) establishment  of  green  leadership  team,  set  up           expected recovery system. 
                 supervisor.                                                       Measures: 
                     Clear   green    management workflow, arrange  a              (1) establish  pre-supply  schemes  and  dynamically 
                 reasonable division of labor is to raise the level of the         adjusted throughout the supply plan, before the start of 
                 key  green  personnel  management.   Identify  major              the  first  based  on  the  total  project  amount  and  the 
                 pollution problems and for building materials, energy             overall project schedule, and work out the total material 
                 wastage  proposed  rectification  plan  and  oversee  the         supply  plan,  and  implementation  of  major  material 
                                                                              391
                                                                            
                suppliers, sub-batches supplied by the supply Principles           According  to  the  survey  found  that  there  is 
                goods and materials suppliers signed a supply contract.        currently a lot of construction companies the following 
                (2) be classified according to the material properties of      questions: 
                preservation, and the establishment of material marking            (1)    management        institutions    are     not 
                system.                                                        perfect, management system is imperfect 
                     The  steel  needed  moisture,  rust,  cement  needs           (2) machinery and equipment obsolete, high energy 
                moisture, water, indoor storage warehouses should be           consumption. 
                established. For different diameters of steel, cement and          (3)  the  use  and  maintenance  of  machinery  and 
                other  different  labels  are  kept  separate  and  do  good   equipment disjointed 
                classification category labels.                                    (4) maintenance  of  equipment lag,  serious  waste, 
                (3) to  establish   more    than    expected    recovery       some of the repair value  is still much to be repaired 
                mechanism, saving  materials,  recycling  and  reuse  of       without the use of old pieces. 
                residual  material. And  the  establishment  of  material          To  solve  these  problems  this  paper  makes  the 
                savings incentive mechanisms.                                  following recommendations: 
                (4) strengthen personnel specific job skills training, and         (1)  improve  the  mechanical  management  system 
                materials  management  staff  hold  regular  job  skills       and  improve  the  mechanical  management  rules  and 
                assessment appraisal. Continuously improve the quality         regulations. Establish and improve the machinery and 
                of  personnel  and  corporate  management  materials           equipment  management  agencies,  to  conduct  a 
                management level.                                              comprehensive integrated     management . Strive      to 
                2.4 Green Machine Management                                   professional  management,  clear  responsibility  and 
                     Management is currently construction engineering          authority for managing personnel. 
                machinery     enterprises  engaged     in   construction           (2) strengthen equipment maintenance system. Old 
                production is extremely  important work. Construction          and new equipment for the different characteristics of 
                Machinery in a modern building construction has been           different measures. For the old equipment, to eliminate 
                particularly prominent role, machinery and equipment           hidden  dangers  to  ensure  the  operation,  focusing  on 
                management in construction enterprises are also more           timely  repair;  For  new equipment, places to  improve 
                and more attention.                                            the  skill  level,  to  strengthen  the  maintenance  as  the 
                     Green      Machine       management:       building       focus,  so  as  to  effectively  ensure  that  each  use  of 
                construction enterprises according to the project needs a      equipment performance and safety . 
                scientific  and  reasonable  for  purchase  or  lease  of          (3)  increase  the  technical  training,  equipment 
                machinery  and  equipment,  a  reasonable  allocation,         selection  of  outstanding  management  personnel. The 
                regulate the use, maintenance and repair equipment in a        construction  enterprises  should  increase  technical 
                timely  manner,  out  of  those  backward,  high  energy       training, selection and training of a group of technical 
                consumption, heavy pollution equipment to save energy          front,  will  manage  the  complex  talent  to  meet  the 
                environmentally efficient target.                              development     needs    of   enterprise   management 
                     Machinery  and  equipment  management,  from              machinery. 
                construction  machine management, use,  maintenance,               (4)  innovation  and  improvement  construction 
                repair  several   aspects,   to   improve  mechanical          machinery, Not  only  can  improve  the  efficiency  of 
                equipment, technology and management level, improve            construction, but also to contribute directly to the green 
                mechanical efficiency ,  speed  up  the  progress,  reduce     construction.  Such  as  the  new  environment-friendly 
                construction personnel are operating strength , enhance        machinery research and development, with low energy 
                their market competitiveness.Due to various factors, the       consumption,  low  noise,  high  efficiency,  in  order  to 
                construction   enterprises   in  the   machinery  and          achieve green construction to provide a guarantee. 
                equipment  management  process  still  faces  many             2.5 Green Quality Management 
                practical problems to solve.                                        After years of development of quality management 
                                                                               has been increasingly improved. However, the quality 
                                                                          392
The words contained in this file might help you see if this file matches what you are looking for:

...International conference on advances in social science humanities and management asshm research construction site of green sustainability shao junyi cheng liangjian abstract a good job quality schedule cost safety other integrating the development sustainable ideas specific goals while considering environmental into for problems protection resource conservation deficiencies through corporate health macro establishment system framework strengthen improve propose effective enterprises should be based measure improvement perfect are facing situation keywords needs formulate certain period overall status goal to achieved according personnel materials machinery economic trend will etc were asked develop several major inevitably affect enterprise aspects sub future prospects then layers implementation subordinate officers industry as an energy guzzler various departments well each employee tight constraints faced serious higher assurance pollution ecosystem degradation grim measures forming ...