                        NETWORK RAIL 14 
                               Network Rail 
                      Schedule of Amendments to 
                            JCT SBC/Q 2016 
             Standard Building Contract with Quantities 
                                      for 
                        [Insert Contract Title] 
                                        
            
            
            
            
                       
                         Contract No: [Insert] 
                       
                                       
           VERSION 3.3 
            
             NETWORK RAIL 14 
              
                    JCT SBC/Q 2016 STANDARD BUILDING CONTRACT WITH QUANTITIES 
                                     CONTRACT AGREEMENT 
             This Agreement is made the [Insert] of [Insert] between: 
             (1)  NETWORK RAIL INFRASTRUCTURE LIMITED registered in England and Wales as 
                  company number 2904587 and having its registered office at 1 Eversholt Street, London, 
                  NW1 2DN  (“the Employer”); and 
             (2)  [Insert] [registered in …………………… as company number …………….] and having its 
                  [registered office at ………………………………………………………………………] (“the 
                  Contractor”). 
             Whereas:                      
             First      The Employer wishes to have the following work carried out: 
              [Insert]  
                        at [Insert] (the “Works”) and has had drawings and bills of quantities prepared 
                        which show and describe the work to be done;  
             Second     The Contractor has supplied the Employer with a fully priced copy of the bills of 
                        quantities, which is included in the Pricing Document (the “Contract Bills”);  
             Third      The drawings are numbered/listed in the Technical Workscope annexed to this 
                        Contract (“the Contract Drawings”); 
             Fourth     For the purposes of the Construction Industry Scheme (CIS) under the Finance 
                        Act 2004, the status of the Employer is, at the Base Date, that stated in the 
                        Contract Particulars; 
             Fifth      The Employer has provided the Contractor with a schedule (the “Information 
                        Release Schedule”) which states the information the Employer’s Representative 
                        will release and the time of that release; 
             Sixth      The division of the Works into Sections is shown in the Technical Workscope or in 
                        such other documents as are identified in the Appendix: Contract Particulars; 
             Seventh    Not used;  
             Eighth     Where any of Supplemental Provisions 1 to 6, 9 and 10 apply is stated in the 
                        Contract Particulars;  
                        The Ninth to Twelfth Recitals apply only where there is a Contractor’s Designed 
                        Portion. 
             Ninth      The Works include the design and construction of [Insert] (the “Contractor’s 
                        Designed Portion”);  
             Tenth      The Employer has supplied to the Contractor documents showing and describing 
                        or otherwise stating his requirements for the design and construction of the 
                        Contractor’s Designed Portion which are included in the Technical Workscope 
                        (the “Employer’s Requirements”); 
                         
                         
             VERSION 3.3 
              
                  NETWORK RAIL 14 
                   
                  Eleventh        In response to the Employer’s Requirements the Contractor has supplied to the 
                                  Employer: 
                                        documents showing and describing the Contractor’s proposals, for the 
                                         design and construction of the Contractor’s Designed Portion (the 
                                         “Contractor’s Proposals”); and 
                                        an analysis of the portion of the Contract Sum relating to the Contractor’s 
                                         Designed Portion which is included in the Pricing Document (the “CDP 
                                         Analysis”); 
                  Twelfth         The Contractor has examined the Employer’s Requirements and confirms that 
                                  they are satisfied by the Contractor’s Proposals; 
                   
                  Articles 
                  Now it is hereby agreed as follows: 
                  Article 1: Contractor’s obligations 
                  The Contractor shall carry out and complete the Works in accordance with the Contract 
                  Documents. 
                  Article 2: Contract Sum 
                  The Employer shall pay the Contractor at the times and in the manner specified in the Conditions 
                  the VAT-exclusive sum of: 
                  [Insert] (£[Insert]) (the “Contract Sum”) 
                  or such other sum as shall become payable under this Contract. 
                  Article 3: Employer’s Representative 
                  For the purposes of this Contract the Employer’s Representative is: 
                  [Insert] 
                  of Network Rail Infrastructure Limited or, if he ceases to be the Employer’s Representative, 
                  such other person as the Employer shall nominate in accordance with clause 3.5 of the 
                  Conditions.  
                  Article 4: Quantity Surveyor 
                  For the purposes of this Contract the Quantity Surveyor is 
                  [Insert] 
                  of  
                  [Insert] 
                  or, if he ceases to be the Quantity Surveyor, such other person as the Employer shall nominate in 
                  accordance with clause 3.5 of the Conditions. 
                   
                   
                  VERSION 3.3 
                   
             NETWORK RAIL 14 
              
             Article 5: Principal Designer 
             The Principal Designer for the purposes of the CDM Regulations is:  
             [Network Rail Infrastructure Limted] 
             or such replacement as the Employer at any time appoints to fulfil that role. 
             Article 6: Principal Contractor 
             The Principal Contractor for the purposes of the CDM Regulations is the Contractor or such 
             replacement as the Employer at any time appoints to fulfil that role. 
             Article 7: Adjudication 
             If any dispute or difference arises under this Contract, either Party may refer it to adjudication in 
             accordance with clause 9.2. 
             Article 8: Legal proceedings 
             Subject to Article 7, the English courts shall have jurisdiction over any dispute or difference 
             between the Parties which arises out of or in connection with this Contract. 
             Article 9: Priority of Documents 
             The following documents are annexed hereto and shall form and be read and construed as part of 
             this Agreement and in case of any ambiguity or discrepancy shall have the following order of 
             priority: 
                    (a) This Contract Agreement 
                    (b)   Schedule of Post Tender Amendments; 
                    (c)   Appendix: Contract Particulars; 
                    (d)   Contract Specific Conditions and annexed form of parent company guarantee, 
                          form of deed of collateral warranty and novation (if applicable) and form of Trust 
                          Deed and PBA Sub Contractor Joining Deed (if applicable); 
                    (e)   The JCT SBC/Q 2016 Standard Building Contact with Quantities, as amended 
                          and supplemented by the NR14 Schedule of Amendments; 
                    (f) Technical Workscope; 
                    (g)   Contract Requirements HSEA; 
                    (h) Preliminaries; 
                    (i)   Pricing Document, and 
                    (j)   Contractor’s Proposals (if any). 
             Article 10: Parent Company Guarantee 
             Where it is stated in the Appendix: Contract Particulars that a parent company guarantee is 
             required, the Contractor shall obtain and provide to the Employer forthwith upon entry into this 
             Contract a parent company guarantee in the form appended to the Contract Specific Conditions 
             from the Contractor’s ultimate holding company. For these purposes, “ultimate holding company” 
             shall mean the parent company of the group of companies of which the Contractor is a member 
             (as each of those terms is defined in Section 170 Taxation of Chargeable Gains Act 1992). 
             VERSION 3.3 
              
The words contained in this file might help you see if this file matches what you are looking for:

...Network rail schedule of amendments to jct sbc q standard building contract with quantities for no version agreement this is made the between infrastructure limited registered in england and wales as company number having its office at eversholt street london nw dn employer contractor whereas first wishes have following work carried out works has had drawings bills prepared which show describe be done second supplied a fully priced copy included pricing document third are numbered listed technical workscope annexed fourth purposes construction industry scheme cis under finance act status base date that stated particulars fifth provided information release states s representative will time sixth division into sections shown or such other documents identified appendix seventh not used eighth where any supplemental provisions apply ninth twelfth recitals only there designed portion include design tenth showing describing otherwise stating his requirements eleventh response proposals an an...

no reviews yet
Please Login to review.