HIOSH DIRECTIVE
DIRECTIVE NO.: CPL 02-00-165 EFFECTIVE DATE: January 1, 2022
SUBJECT: Compliance Directive for the Excavation Standard, 29 CFR 1926, Subpart P
This CPL is adopted by HIOSH in its entirety.
Clarifications: For the purposes of this OSHA Program Directive adopted by HIOSH, the
following terms are defined:
Where the U.S. Department of Labor, Occupational Safety and Health Administration (OSHA)
refers to the following positions or locations; for HIOSH, their equivalent will be:
29 CFR 1926, Subpart P: As adopted under the Hawaii Administrative Rules,
§12-110-50(a)
Area Director(s): Branch Manager(s)
Area Office/Regional Office: State of Hawaii Department of Labor & Industrial
Relations, HIOSH office located at 830 Punchbowl Street, Room 423, Honolulu, Hawaii
96813
CPL 02-00-087, Inspection Procedures for Enforcing the Excavation Standards – 19
CFR 1926, Subpart P, issued February 20, 1990: CPL 02-00-087 Inspection Procedures
for Enforcing the Excavation Standards – 29 CFR 1926, Subpart P, issued February 20,
1990. Adopted by HIOSH March 19, 1990.
OSHA Compliance Safety and Health Officer(s)/CSHO(s): Environmental Health
Specialist(s) and Occupational Safety and Health Compliance Officer(s)
OSHA Field Safety and Health Manual, ADM 04-00-003: HIOSH Internal Procedures
and Union Contracts
OSHA: Hawaii Occupational Safety & Health (HIOSH) Enforcement/Compliance and
Consultation & Training sections, located at 830 Punchbowl Street, Room 423, Honolulu,
Hawaii 96813
Regional Administrator: HIOSH Administrator
Action Office: HIOSH
Contact: HIOSH Administration and Technical Support Branch. 830 Punchbowl St,
Rm 425, Honolulu, HI 96813. (808) 586 - 9116
By and Under the Authority of
NORMAN AHU
HIOSH Administrator
U.S. DEPARTMENT OF LABOR Occupational Safety and Health Administration
DIRECTIVE NUMBER: CPL 02-00-165 EFFECTIVE DATE: 7/1/21
SUBJECT: Compliance Directive for the Excavation Standard, 29 CFR 1926, Subpart P
ABSTRACT
Purpose: This instruction provides guidance and inspection procedures for the
enforcement of Subpart P.
Scope: This instruction applies OSHA-wide.
References: 1. 29 CFR Part 1926 Subpart P – Excavations.
2. OSHA Instruction CPL-02-00-161, National Emphasis Program on
Trenching and Excavation, October 1, 2018.
3. OSHA Instruction, CPL 02-00-164, Field Operations Manual (FOM),
April 14, 2020.
Cancellations: This instruction supersedes OSHA Instruction CPL 02-00-087, Inspection
Procedures for Enforcing the Excavation Standards - 29 CFR 1926,
Subpart P, issued February 20, 1990.
State Impact: Notice of intent and equivalency required.
Action Offices: National, Regional, and Area Offices.
Originating Office: Directorate of Construction (DOC).
Contact: Director, Office of Construction Services
200 Constitution Ave. NW, Room N3476
Washington, DC 20210
Phone (202) 693-2020
By and Under the Authority of
James Frederick
Principal Deputy Assistant Secretary
Executive Summary
This instruction provides current information and guidance to the Occupational Safety and
Health Administration (OSHA) National, Regional, and Area Offices concerning OSHA’s
policy and procedures for conducting excavation inspections, and for the enforcement of 29
CFR 1926, Subpart P – Excavations.
Significant Changes
1. Addition of Inspection Guidance and Citation Policy for specific provisions in 29 CFR
1926, Subpart P.
2. Addition of general inspection procedures.
3. Inclusion of 29 CFR 1926, Subpart P standard interpretations.
4. Insertion of hyperlinks to referenced OSHA documents.