It’s a Different Contracting World!
It’s a Different Contracting World!
Performance-Based Acquisition fundamentally
Performance-Based Acquisition fundamentally
changed contract formation and administration
changed contract formation and administration
Objectives structured into contracts and
Objectives structured into contracts and
multiple incentive arrangements
multiple incentive arrangements
Contractors and Federal staff adjusting to a
Contractors and Federal staff adjusting to a
cultural change
cultural change
2
2
When does Contract Management
When does Contract Management
start?
start?
Old View
Old View
–Started at contract award
Started at contract award
–Embodied a post-award orientation
Embodied a post-award orientation
New View
New View
–Effective contract administration starts early with contract
Effective contract administration starts early with contract
management planning
management planning
–Begins during the acquisition planning phase
Begins during the acquisition planning phase
–Recognizes the performance-based elements of the
Recognizes the performance-based elements of the
contract
contract
–The Contract Management Plan is in place before or
The Contract Management Plan is in place before or
shortly after the time of award
shortly after the time of award
3
3
The Performance-Based Contract
The Performance-Based Contract
What are the elements of Performance-Based
What are the elements of Performance-Based
Contracting?
Contracting?
Government Protocols Require:
Government Protocols Require:
Establish requirements in a results oriented manner
Establish requirements in a results oriented manner
Ensure that Contract measures and expectations are measurable and
Ensure that Contract measures and expectations are measurable and
correspond to work requirements
correspond to work requirements
Ensure that Quality Assurance Surveillance Plans are tailored to contract
Ensure that Quality Assurance Surveillance Plans are tailored to contract
objectives
objectives
Incorporate cost constraints or cost incentives
Incorporate cost constraints or cost incentives
Acquisition Guide
Acquisition Guide
Performance Based Contracting Guides – provides guidance
Performance Based Contracting Guides – provides guidance
on structuring effective incentives
on structuring effective incentives
4
4
The Performance-Based Contract
The Performance-Based Contract
What are the elements of Performance-Based
What are the elements of Performance-Based
Contracting? (cont.)
Contracting? (cont.)
In 1997 Rules mandated that PBCs
In 1997 Rules mandated that PBCs
Requirements are structured in a results or outcome
Requirements are structured in a results or outcome
oriented manner
oriented manner
Positive and/or negative incentives are included
Positive and/or negative incentives are included
Quality Assurance Surveillance Plans are required
Quality Assurance Surveillance Plans are required
5
5
What are the Contracting Officers
What are the Contracting Officers
Responsibilities in Performance-Based
Responsibilities in Performance-Based
Contracting?
Contracting?
Other Contracting Rules Require:
Other Contracting Rules Require:
– Ensure that performance-based contracting used to the
Ensure that performance-based contracting used to the
maximum extent practicable.
maximum extent practicable.
– Use contract types that best fits the work and likely to
Use contract types that best fits the work and likely to
motivate contractors.
motivate contractors.
– Use positive or negative performance incentives to the
Use positive or negative performance incentives to the
maximum extent practicable.
maximum extent practicable.
– Quality assurance surveillance plan shall contain measurable
Quality assurance surveillance plan shall contain measurable
inspection and acceptance criteria corresponding to the
inspection and acceptance criteria corresponding to the
performance standards of the SOW.
performance standards of the SOW.