sheet 1 summary construction cost estimate for subdivision work user notes a the purpose of this table is to estimate construction costs for subdivision work in order to determine development ...

icon picture XLSX Filetype Excel XLSX | Posted on 14 Aug 2022 | 3 years ago
Partial file snippet.
Sheet 1: Summary
CONSTRUCTION COST ESTIMATE FOR SUBDIVISION WORK

User Notes

(a) The purpose of this table is to estimate construction costs for subdivision work in order to determine development application fees.

(b) The unit rates, although independently verified and considered accurate for the purpose of calculating a genuine construction cost estimate, are indicative only. Applicants may nominate there own rate. Refer to User Notes (c), (d) and (e).

(c) Applicants may provide an alternate form of construction cost estimate which will be checked by Council.

(d) If the applicant's estimate is a variation of more than 10% to Council's estimate, the applicant may be required to engage an independent quantity surveyor to review the cost estimate. (Refer to NSW Planning & Infrastructure Draft Planning Circular)

(e) Please read the Declaration in Section 10 of this document. The Declaration must be complete if using this document to estimate the construction cost.

Project Details

(a) Property address Windows User: Lot, DP, street number and name

(b) Application no. (if known) Windows User: Pre-lodgement or DA No.

(c) No. of lots

(d) Site area (m2)
Item Description Quantity Unit Unit Rate
(Ex GST)
Amount
(Ex GST)
1 General

Site Establishment, disestablishment, restoration & clean up ADMIN: Please select based on the below criteria as a general guide: * Minor - Duration <1 week, scale of up to 3 lots * Medium - Duration from 1-8 weeks , scale between 3-8 lots * Major - Duration >8 weeks, scale >8 lots Medium Item N/A $3,000.00

Survey setout ADMIN: Please select based on the below criteria as a general guide: * Minor - Inter-allotment drainage, lot pegging (max 3 lots) * Medium - Road and drainage work <50m, lot pegging (3-8 lots) * Major - Road and drainage work, lot pegging >8 lots, building envelope setout Medium Item N/A $3,000.00

Environmental controls ADMIN: Please select based on the below criteria as a general guide: * Minor - <50m sediment fencing, short construction duration up to 2 weeks * Medium - >50m sediment fencing, shake down area, infill residential environment, medium construction duration (2-8 weeks) * Major - Adjacent to watercourse, temporary sediment basin, diversion drains, long construction duration >8weeks, establishment period required after completion of construction Medium Item N/A $3,000.00

Traffic control ADMIN: Please select based on the below criteria as a general guide: * Minor - local road, partial day duration, 1-2 days maximum * Medium - local road, stop/go control required, full day duration for up to 1 week * Major - major road, duration >1 week , overnight signalised control required Medium Item N/A $6,000.00
2 Site Preparation

Clear approved trees, chip, stockpile and/or dispose
No. Trees $200.00 $-

Clear approved vegetation, chip, stockpile and/or dispose
m2 $10.00 $-

ADMIN: Includes buildings, concrete slabs, kerbs, pavements, drainage structures Demolish and dispose of structures
m2 $100.00 $-

Decommission, backfill and compact dam
m2 $90.00 $-

Decontamination or remediation
m3 $250.00 $-
3 Earthworks

ADMIN: Balanced cut and fill over site average 0.5/1m deep. Includes cart to fill areas, spread, form and compact. Balanced cut and fill
m3 $12.00 $-

Excavate for roads, driveways, pathways, batters and site regrade areas
m2 ADMIN: Allows for a maximum of 500mm cut $5.00 $-

Import & compact fill
m3 $50.00 $-

Dispose surplus material off-site to an approved location (including tipping fees)
m3 $25.00 $-
4 Drainage

Interallotment Drainage - excavate trench, supply, bed, lay, cap, joint and backfill PVC pipe

(a) 225mm dia or less
m ADMIN: Refer to rate breakup sheet $84.00 $-

(b) >225mm dia
m ADMIN: Refer to rate breakup sheet $185.00 $-

(c) Junction pit
No ADMIN: Refer to rate breakup sheet $650.00 $-

Concrete Pipe - excavate trench, supply, bed, lay, cap, joint and backfill

(a) 750mm dia or less
m ADMIN: Refer to rate breakup $368.00 $-

(b) >750mm dia
m ADMIN: Refer to rate breakup $715.00 $-

(c) Junction pit
No $1,300.00 $-

(d) Kerb inlet pit
No $2,500.00 $-

Stormwater Pollution Control & Water Sensitive Urban Design

(a) Gross Pollutant Trap
No. $28,000.00 $-

(b) Litter basket/Pit insert
No. $800.00 $-

(c) Raingarden
No. $2,500.00 $-

(d) Bioswale
m $200.00 $-
5 Roadworks

Kerb and gutter
m $110.00 $-

Subgrade, sub-base, DGB20 basecourse, 2 coat HBS, AC wearing surface
m2 ADMIN: Refer to rate breakup $85.00 $-

Roundabout (standard single lane)
No. ADMIN: Review rate based on application $140,000.00 $-

Roundabout (dual lane)
No. ADMIN: Review rate based on application $500,000.00 $-
6 Concrete footpaths, cycleways, layback and driveways

ADMIN: 75mm thick, unreinforced, no colour 1.5m wide concrete footpath
m $93.00 $-

ADMIN: 100mm thick, F62 mesh reinforcement, coloured honeycomb 2.5m wide concrete cycleway
m $228.00 $-

Laybacks
m $135.00 $-

Driveways
m2 $105.00 $-
7 Service Utilities

Water
m ADMIN: Refer to rate breakup $115.00 $-

Recycled water
m ADMIN: Refer to rate breakup $115.00 $-

Sewer
m ADMIN: Refer to rate breakup $135.00 $-

Sewer manhole
No $5,000.00 $-

Electricity, Telecommunications & Gas
No of lots ADMIN: Approx $6500/lot based on average lot width of 18m @ $360/m as follows: * $45/m trench excavtion (3 way shared trench - power, telco & gas) * $160/m HV, LV, SL, Telco cable in duct, gas duct * $75/m street lighting contribution (1 every 2 lots) * $75/m substation contribution (1 every 30 lots) * $5/m for pillar boxes & terminals (1 every 2 lots) $6,500.00 $-

Relocate existing pole and cable
No. $15,000.00 $-
8 Landscaping

ADMIN: The following rates apply to retaining walls with a maximum height of 1200mm. Retaining wall costs increase significantly beyond 1200mm high Retaining Walls

(a) Timber (Max 1200mm high)
m2 $220.00 $-

(b) Masonry (Max 1200mm high)
m2 $320.00 $-

(c) Concrete retaining wall system (e.g. Loc-A-Bloc, Keystone) (Max 1200mm high)
m2 $380.00 $-

Fencing

(a) 1.8m high timber lap & cap or colourbond
m $85.00 $-

(b) Acoustic fencing (2.1m high masonry)
m $250.00 $-

Street trees (45l)
No of lots ADMIN: 2 street trees required per lot @ $250 each $500.00 $-

Turf (1.2m strip behind kerb and selected areas)
m2 $8.50 $-

Shrubs and ground cover
m2 $8.50 $-
9 Other items

Integrated Housing

Standard project home
m2 ADMIN: * Area measured to inside face of external wall * Include living area,garage, alfresco,porch/verandah, and balcony $995.00 $-

Premium project home
m2 ADMIN: * Area measured to the inside face of the external wall * Include living area,garage, alfresco,porch/verandah, and balcony $1,100.00 $-

Landscaping, driveway, paving, letterbox, clothes line etc
No of lots $15,000.00 $-

Specify others


$-





$-

DIRECT COSTS $15,000.00

ADMIN: Includes project management, co-ordination of utility service providers, Council and service utility inspection, connection and testing fees, geotechnical density compaction testing etc. DOES NOT include design fees Contingency & professional construction related fees
Item 10.0% $1,500.00

ADMIN: Economies of scale have an impact on cost estimates as cost advantages can be obtained on larger developments. To maintain simplicity of this estimator, the following loadings apply: 1.1 (1-4 lots) 1.0 (5-14 lots) 0.9 (15+ lots) Economies of scale factor
Item 1.1 $1,650.00

SUB-TOTAL $18,150.00


GST $1,815.00
TOTAL ESTIMATED CONSTRUCTION COST $20,000
10 Declaration

(a) I am a suitably qualified person with experience in costing development work of this scale and nature.

(b) I confirm this is a genuine construction cost estimate of the proposed project subject to the accompanying Development Application.

(c) I understand that a person is guilty of an offence if the person makes any statement, knowing it to be false or misleading in connection with any document lodged with the consent authority (clause 283 of the Environmental Planning & Assessment Regulation)
Name:

Signature:

Date:


The words contained in this file might help you see if this file matches what you are looking for:

...Sheet summary construction cost estimate for subdivision work user notes a the purpose of this table is to costs in order determine development application fees b unit rates although independently verified and considered accurate calculating genuine are indicative only applicants may nominate there own rate refer c d e provide an alternate form which will be checked by council if applicant s variation more than required engage independent quantity surveyor review nsw planning amp infrastructure draft circular please read declaration section document must complete using project details property address windows lot dp street number name no known prelodgement or da lots site area m item description ex gst amount general establishment disestablishment restoration clean up admin select based on below criteria as guide minor duration lt week scale medium from weeks between major gt na survey setout interallotment drainage pegging max road building envelope environmental controls sediment fen...

no reviews yet
Please Login to review.