Construction Components |
QTY |
U/M |
Unit Rate |
|
|
|
|
|
|
|
|
|
|
|
Trail System |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Trail - Asphalt |
|
|
|
|
|
|
|
Asphalt - 4" thk. |
|
1 |
SF |
$3.75 |
|
|
|
Aggregate base - 6" thk. |
|
1 |
SF |
$0.93 |
|
|
|
Grading - rough |
|
1 |
SF |
$0.15 |
|
|
|
Grading - fine |
|
1 |
SF |
$0.30 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.40 |
|
|
|
|
|
|
|
$29,176.89 |
|
|
|
Trail - Concrete |
|
|
|
|
|
|
|
Concrete - 4" thk. |
|
1 |
SF |
$8.75 |
|
|
|
Aggregate base - 6" thk. |
|
1 |
SF |
$0.93 |
|
|
|
Grading - rough |
|
1 |
SF |
$0.15 |
|
|
|
Grading - fine |
|
1 |
SF |
$0.30 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.40 |
|
|
|
|
|
|
|
$55,576.89 |
|
|
|
|
|
|
|
|
|
|
|
Trail - Gravel |
|
|
|
|
|
|
|
Gravel - 4" thk. |
|
1 |
SF |
$1.04 |
|
|
|
Aggregate base - 6" thk. |
|
1 |
SF |
$0.93 |
|
|
|
Grading - rough |
|
1 |
SF |
$0.15 |
|
|
|
Grading - fine |
|
1 |
SF |
$0.30 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.40 |
|
|
|
|
|
|
|
$14,862.22 |
|
|
|
|
|
|
|
|
|
|
|
Trail - Native Surface |
|
|
|
|
|
|
|
Trail compaction |
|
1 |
SF |
$0.45 |
|
|
|
Grading - rough |
|
1 |
SF |
$0.15 |
|
|
|
Grading - fine |
|
1 |
SF |
$0.30 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.40 |
|
|
|
|
|
|
|
$6,864.00 |
|
|
|
|
|
|
|
|
|
|
|
Boardwalk System |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Boardwalk - concrete |
|
|
|
|
|
|
|
Concrete deck, incl. frame |
|
1 |
SF |
$65.00 |
|
|
|
Support structure/footing |
|
1 |
SF |
$22.00 |
|
|
|
Grading - fine |
|
1 |
SF |
$0.30 |
|
|
|
Excavation |
|
1 |
SF |
$1.30 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.40 |
|
|
|
|
|
|
|
$89.00 |
|
|
|
Boardwalk - metal |
|
|
|
|
|
|
|
Metal grid panel |
|
1 |
SF |
$18.50 |
|
|
|
Metal frame |
|
1 |
SF |
$14.00 |
|
|
|
Support structure/footing |
|
1 |
SF |
$22.00 |
|
|
|
Grading - fine |
|
1 |
SF |
$0.30 |
|
|
|
Excavation |
|
1 |
SF |
$1.30 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.40 |
|
|
|
|
|
|
|
$56.50 |
|
|
|
Boardwalk - timber |
|
|
|
|
|
|
|
Timber plank |
|
1 |
SF |
$12.00 |
|
|
|
Timber frame |
|
1 |
SF |
$12.00 |
|
|
|
Support structure/footing |
|
1 |
SF |
$22.00 |
|
|
|
Grading - fine |
|
1 |
SF |
$0.30 |
|
|
|
Excavation |
|
1 |
SF |
$1.30 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.40 |
|
|
|
|
|
|
|
$48.00 |
|
|
|
Boardwalk - fiberglass |
|
|
|
|
|
|
|
Fiberglass plank |
|
1 |
SF |
$7.50 |
|
|
|
Fiberglass frame |
|
1 |
SF |
$10.50 |
|
|
|
Support structure/footing |
|
1 |
SF |
$22.00 |
|
|
|
Grading - fine |
|
1 |
SF |
$0.30 |
|
|
|
Excavation |
|
1 |
SF |
$1.30 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.40 |
|
|
|
|
|
|
|
$42.00 |
|
|
|
|
|
|
|
|
|
|
|
Bridge System |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Bridge - concrete |
|
|
|
|
|
|
|
Concrete deck, incl. frame |
|
1 |
SF |
$65.00 |
|
|
|
Railing - concrete |
|
1 |
SF |
$37.50 |
|
|
|
Support structure/footing |
|
1 |
SF |
$110.00 |
|
|
|
Grading - fine |
|
1 |
SF |
$0.30 |
|
|
|
Excavation |
|
1 |
SF |
$1.30 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.40 |
|
|
|
|
|
|
|
$214.50 |
|
|
|
Bridge - steel |
|
|
|
|
|
|
|
Metal grid panel |
|
1 |
SF |
$30.00 |
|
|
|
Metal frame |
|
1 |
SF |
$27.50 |
|
|
|
Railing - metal |
|
1 |
SF |
$33.33 |
|
|
|
Support structure/footing |
|
1 |
SF |
$110.00 |
|
|
|
Grading - fine |
|
1 |
SF |
$0.30 |
|
|
|
Excavation |
|
1 |
SF |
$1.30 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.40 |
|
|
|
|
|
|
|
$202.83 |
|
|
|
Bridge - timber |
|
|
|
|
|
|
|
Timber plank |
|
1 |
SF |
$12.00 |
|
|
|
Timber frame |
|
1 |
SF |
$12.00 |
|
|
|
Railing - timber |
|
1 |
SF |
$25.00 |
|
|
|
Support structure/footing |
|
1 |
SF |
$110.00 |
|
|
|
Grading - fine |
|
1 |
SF |
$0.30 |
|
|
|
Excavation |
|
1 |
SF |
$1.30 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.40 |
|
|
|
|
|
|
|
$161.00 |
|
|
|
Bridge - fiberglass |
|
|
|
|
|
|
|
fiberglass plank |
|
1 |
SF |
$7.50 |
|
|
|
fiberglass frame |
|
1 |
SF |
$10.50 |
|
|
|
Railing - synthetic |
|
1 |
SF |
$19.17 |
|
|
|
Support structure/footing |
|
1 |
SF |
$110.00 |
|
|
|
Grading - fine |
|
1 |
SF |
$0.30 |
|
|
|
Excavation |
|
1 |
SF |
$1.30 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.40 |
|
|
|
|
|
|
|
$149.16 |
|
|
|
|
|
|
|
|
|
|
|
Culvert |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Culvert - 18" dia. |
|
|
|
|
|
|
|
Culvert |
|
1 |
LF |
$50.00 |
|
|
|
Aggregate base - 6" thk. |
|
1 |
LF |
$2.78 |
|
|
|
Excavation |
|
1 |
LF |
$2.92 |
|
|
|
Grading - fine |
|
1 |
LF |
$0.45 |
|
|
|
Site clearing/demolition |
|
1 |
LF |
$0.80 |
|
|
|
|
|
|
|
$56.94 |
|
|
|
Culvert - 24" dia. |
|
|
|
|
|
|
|
Culvert |
|
1 |
SF |
$60.00 |
|
|
|
Aggregate base - 6" thk. |
|
1 |
SF |
$3.70 |
|
|
|
Excavation |
|
1 |
SF |
$5.19 |
|
|
|
Grading - fine |
|
1 |
SF |
$0.60 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$1.00 |
|
|
|
|
|
|
|
$70.49 |
|
|
|
Culvert - 36" dia. |
|
|
|
|
|
|
|
Culvert |
|
1 |
SF |
$90.00 |
|
|
|
Aggregate base - 6" thk. |
|
1 |
SF |
$5.56 |
|
|
|
Excavation |
|
1 |
SF |
$11.67 |
|
|
|
Grading - fine |
|
1 |
SF |
$0.90 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$1.40 |
|
|
|
|
|
|
|
$109.52 |
|
|
|
|
|
|
|
|
|
|
|
Culvert - 48" dia. |
|
|
|
|
|
|
|
Culvert |
|
1 |
SF |
$120.00 |
|
|
|
Aggregate base - 6" thk. |
|
1 |
SF |
$7.41 |
|
|
|
Excavation |
|
1 |
SF |
$20.74 |
|
|
|
Grading - fine |
|
1 |
SF |
$1.20 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$1.80 |
|
|
|
|
|
|
|
$151.15 |
|
|
|
|
|
|
|
|
|
|
|
Parking Lot |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Parking lot - asphalt |
|
|
|
|
|
|
|
Asphalt - vehicular |
|
1 |
SF |
$6.15 |
|
|
|
Striping |
|
1 |
SF |
$0.07 |
|
|
|
Aggregate base - 6" thk. |
|
1 |
SF |
$1.20 |
|
|
|
Grading - rough |
|
1 |
SF |
$0.15 |
|
|
|
Grading - fine |
|
1 |
SF |
$0.30 |
|
|
|
Demolition - existing surface |
|
1 |
SF |
$2.25 |
|
|
|
|
|
|
|
$10.12 |
|
|
|
Parking lot - concrete |
|
|
|
|
|
|
|
Concrete - vehicular |
|
1 |
SF |
$14.50 |
|
|
|
Striping |
|
1 |
SF |
$0.07 |
|
|
|
Aggregate base - 6" thk. |
|
1 |
SF |
$1.20 |
|
|
|
Grading - rough |
|
1 |
SF |
$0.15 |
|
|
|
Grading - fine |
|
1 |
SF |
$0.30 |
|
|
|
Demolition - existing surface |
|
1 |
SF |
$2.25 |
|
|
|
|
|
|
|
$18.47 |
|
|
|
Parking lot - gravel |
|
|
|
|
|
|
|
Gravel - 4" thk. |
|
1 |
SF |
$1.04 |
|
|
|
Aggregate base - 6" thk. |
|
1 |
SF |
$0.93 |
|
|
|
Grading - rough |
|
1 |
SF |
$0.15 |
|
|
|
Grading - fine |
|
1 |
SF |
$0.30 |
|
|
|
Demolition - existing surface |
|
1 |
SF |
$1.75 |
|
|
|
|
|
|
|
$4.16 |
|
|
|
|
|
|
|
|
|
|
|
Trailhead Access Road |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Trailhead - asphalt surface |
|
|
|
|
|
|
|
Asphalt - vehicular |
|
1 |
SF |
$6.15 |
|
|
|
Aggregate base - 6" thk. |
|
1 |
SF |
$1.20 |
|
|
|
Entry sign - allow |
|
1 |
LS |
$15,000.00 |
|
|
|
Planting - allow |
|
1 |
LS |
$3,000.00 |
|
|
|
Gate/bollard - allow |
|
1 |
LS |
$5,000.00 |
|
|
|
Grading - rough |
|
1 |
SF |
$0.15 |
|
|
|
Grading - fine |
|
1 |
SF |
$0.30 |
|
|
|
Demolition - existing surface |
|
1 |
SF |
$2.25 |
|
|
|
|
|
|
|
$76,083.56 |
|
|
|
Trailhead - concrete surface |
|
|
|
|
|
|
|
Concrete - vehicular |
|
1 |
SF |
$10.50 |
|
|
|
Aggregate base - 6" thk. |
|
1 |
SF |
$1.20 |
|
|
|
Entry sign - allow |
|
1 |
LS |
$15,000.00 |
|
|
|
Planting - allow |
|
1 |
LS |
$3,000.00 |
|
|
|
Gate/bollard - allow |
|
1 |
LS |
$5,000.00 |
|
|
|
Grading - rough |
|
1 |
SF |
$0.15 |
|
|
|
Grading - fine |
|
1 |
SF |
$0.30 |
|
|
|
Demolition - existing surface |
|
1 |
SF |
$2.25 |
|
|
|
|
|
|
|
$99,051.56 |
|
|
|
Trailhead - gravel surface |
|
|
|
|
|
|
|
Gravel - 4" thk. |
|
1 |
SF |
$1.04 |
|
|
|
Aggregate base - 6" thk. |
|
1 |
SF |
$0.93 |
|
|
|
Entry sign - allow |
|
1 |
LS |
$15,000.00 |
|
|
|
Planting - allow |
|
1 |
LS |
$3,000.00 |
|
|
|
Gate/bollard - allow |
|
1 |
LS |
$5,000.00 |
|
|
|
Grading - rough |
|
1 |
SF |
$0.15 |
|
|
|
Grading - fine |
|
1 |
SF |
$0.30 |
|
|
|
Demolition - existing surface |
|
1 |
SF |
$1.75 |
|
|
|
|
|
|
|
$44,990.22 |
|
|
|
|
|
|
|
|
|
|
|
Restroom |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Restroom building |
|
48 |
SF |
|
|
|
|
Concrete continuous footing, 16" x 18" |
|
28 |
LF |
$2,290.00 |
|
|
|
4" slab-on grade |
|
48 |
SF |
$504.00 |
|
|
|
Exterior wall - 8" CMU |
|
280 |
SF |
$7,840.00 |
|
|
|
Steel roof deck assembly, incl waterproofing and insul. |
|
60 |
SF |
$1,710.00 |
|
|
|
Ceiling and soffit panels |
|
48 |
SF |
$504.00 |
|
|
|
Roof flashing and gutter |
|
28 |
LF |
$560.00 |
|
|
|
Join sealant - allow |
|
1 |
LS |
$1,000.00 |
|
|
|
Exterior door - hollow metal |
|
1 |
EA |
$1,250.00 |
|
|
|
Exterior door hardware |
|
1 |
EA |
$1,200.00 |
|
|
|
Floor finish - etched concrete |
|
48 |
SF |
$480.00 |
|
|
|
Wall finish - paint |
|
280 |
SF |
$490.00 |
|
|
|
Ceiling finish - open to structure |
|
48 |
SF |
$84.00 |
|
|
|
Toilet room accessories |
|
1 |
EA |
$1,450.00 |
|
|
|
Plumbing fixtures and piping - per bathroom |
|
1 |
EA |
$4,500.00 |
|
|
|
Connection and piping to existing sewer system |
|
1 |
ALW |
$17,500.00 |
|
|
|
Water heater |
|
1 |
EA |
$1,250.00 |
|
|
|
Floor drain |
|
1 |
EA |
$1,500.00 |
|
|
|
Power distribution and connection |
|
1 |
LS |
$10,000.00 |
|
|
|
Lighting and controls - allow |
|
48 |
SF |
$960.00 |
|
|
|
Demolition - existing surface |
|
72 |
SF |
$288.00 |
|
|
|
|
|
|
|
$55,360.00 |
|
|
|
|
|
|
|
|
|
|
|
Flush - one stall |
|
|
|
$55,360.00 |
$55,360.00 |
|
|
Flush - two stall |
|
|
|
$49,824.00 |
$24,912.00 |
|
|
Flush - three to five stall |
|
|
|
$39,860.00 |
$13,286.67 |
|
|
FLush - six + |
|
|
|
$37,867.00 |
|
|
|
|
|
|
|
|
|
|
|
Restroom building |
|
48 |
SF |
|
|
|
|
Concrete continuous footing, 16" x 18" |
|
28 |
LF |
$2,290.00 |
|
|
|
4" slab-on grade |
|
48 |
SF |
$504.00 |
|
|
|
Exterior wall - 8" CMU |
|
280 |
SF |
$7,840.00 |
|
|
|
Steel roof deck assembly, incl waterproofing and insul. |
|
60 |
SF |
$1,710.00 |
|
|
|
Ceiling and soffit panels |
|
48 |
SF |
$504.00 |
|
|
|
Roof flashing and gutter |
|
28 |
LF |
$560.00 |
|
|
|
Join sealant - allow |
|
1 |
EA |
$1,000.00 |
|
|
|
Exterior door - hollow metal |
|
1 |
EA |
$1,250.00 |
|
|
|
Exterior door hardware |
|
1 |
EA |
$1,200.00 |
|
|
|
Floor finish - etched concrete |
|
48 |
SF |
$480.00 |
|
|
|
Wall finish - paint |
|
280 |
SF |
$490.00 |
|
|
|
Ceiling finish - open to structure |
|
48 |
SF |
$84.00 |
|
|
|
Toilet room accessories |
|
1 |
EA |
$1,450.00 |
|
|
|
Plumbing fixtures and piping - per bathroom |
|
1 |
EA |
$2,000.00 |
|
|
|
Vault system - allow |
|
1 |
ALW |
$5,000.00 |
|
|
|
Power distribution and connection |
|
1 |
LS |
$10,000.00 |
|
|
|
Lighting and controls - allow |
|
48 |
SF |
$960.00 |
|
|
|
Demolition - existing surface |
|
72 |
SF |
$288.00 |
|
|
|
|
|
|
|
$37,610.00 |
|
|
|
|
|
|
|
|
|
|
|
Vault - one stall |
|
|
|
$37,610.00 |
$37,610.00 |
|
|
Vault - two stall |
|
|
|
$33,849.00 |
$16,924.50 |
|
|
|
|
|
|
|
|
|
|
Trail System Maintenance |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Trail - Asphalt (major rehab) |
|
|
|
|
|
|
|
Asphalt overlay |
|
1 |
SF |
$2.85 |
|
|
|
Base compaction |
|
1 |
SF |
$0.40 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.75 |
|
|
|
|
|
|
|
$21,120.00 |
|
|
|
Trail - Asphalt (routine maintenance) |
|
|
|
|
|
|
|
Asphalt - patch and repair |
|
1 |
SF |
$1.15 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.75 |
|
|
|
|
|
|
|
$10,032.00 |
|
|
|
Trail - Concrete (major rehab) |
|
|
|
|
|
|
|
Concrete - 4" thk. |
|
1 |
SF |
$8.75 |
|
|
|
Grading - fine |
|
1 |
SF |
$0.30 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.75 |
|
|
|
|
|
|
|
$51,744.00 |
|
|
|
Trail - Concrete (routine maintenance) |
|
|
|
|
|
|
|
Concrete - patch and repair |
|
1 |
SF |
$3.50 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.75 |
|
|
|
|
|
|
|
$22,440.00 |
|
|
|
Trail - Gravel (major rehab) |
|
|
|
|
|
|
|
Gravel - 4" thk. |
|
1 |
SF |
$1.04 |
|
|
|
Grading - fine |
|
1 |
SF |
$0.30 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.40 |
|
|
|
|
|
|
|
$9,181.33 |
|
|
|
Trail - Gravel (routine maintenance) |
|
|
|
|
|
|
|
Gravel - touch up 2" thk. |
|
1 |
SF |
$0.52 |
|
|
|
Grading - fine |
|
1 |
SF |
$0.30 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.40 |
|
|
|
|
|
|
|
$6,438.67 |
|
|
|
Trail - Native Surface (major rehab) |
|
|
|
|
|
|
|
Infill - replace loose material |
|
1 |
SF |
$0.50 |
|
|
|
Grading - fine |
|
1 |
SF |
$0.30 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.40 |
|
|
|
|
|
|
|
$6,336.00 |
|
|
|
Trail - Native Surface (routine maintenance) |
|
|
|
|
|
|
|
Grading - fine |
|
1 |
SF |
$0.30 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.40 |
|
|
|
|
|
|
|
$3,696.00 |
|
|
|
|
|
|
|
|
|
|
|
Boardwalk System Maintenance |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Boardwalk - metal (major rehab) |
|
|
|
|
|
|
|
Metal grid panel - replace as required |
|
1 |
SF |
$9.25 |
|
|
|
Metal frame - replace as required |
|
1 |
SF |
$7.00 |
|
|
|
Support structure/footing - repair as required |
|
1 |
SF |
$5.50 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.40 |
|
|
|
|
|
|
|
$22.15 |
|
|
|
Boardwalk - metal (routine maintenance) |
|
|
|
|
|
|
|
Metal grid panel - clean and repair |
|
1 |
SF |
$4.63 |
|
|
|
Metal frame - clean and repair |
|
1 |
SF |
$3.50 |
|
|
|
Support structure/footing - clean and repair |
|
1 |
SF |
$3.30 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.40 |
|
|
|
|
|
|
|
$11.83 |
|
|
|
|
|
|
|
|
|
|
|
Boardwalk - timber (major rehab) |
|
|
|
|
|
|
|
Timber plank - replace as required |
|
1 |
SF |
$6.00 |
|
|
|
Timber frame - replace as required |
|
1 |
SF |
$6.00 |
|
|
|
Support structure/footing - repair as required |
|
1 |
SF |
$5.50 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.40 |
|
|
|
|
|
|
|
$17.90 |
|
|
|
|
|
|
|
|
|
|
|
Boardwalk - timber (routine maintenance) |
|
|
|
|
|
|
|
Timber plank - clean and repair |
|
1 |
SF |
$3.00 |
|
|
|
Timber frame - clean and repair |
|
1 |
SF |
$3.00 |
|
|
|
Support structure/footing - clean and repair |
|
1 |
SF |
$3.30 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.40 |
|
|
|
|
|
|
|
$9.70 |
|
|
|
|
|
|
|
|
|
|
|
Boardwalk - synthetic (major rehab) |
|
|
|
|
|
|
|
Synthetic plank - replace as required |
|
1 |
SF |
$3.75 |
|
|
|
Synthetic frame - replace as required |
|
1 |
SF |
$5.25 |
|
|
|
Support structure/footing - repair as required |
|
1 |
SF |
$5.50 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.40 |
|
|
|
|
|
|
|
$14.90 |
|
|
|
|
|
|
|
|
|
|
|
Boardwalk - synthetic (routine maintenance) |
|
|
|
|
|
|
|
Synthetic plank - clean and repair |
|
1 |
SF |
$1.88 |
|
|
|
Synthetic frame - clean and repair |
|
1 |
SF |
$2.63 |
|
|
|
Support structure/footing - clean and repair |
|
1 |
SF |
$3.30 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.40 |
|
|
|
|
|
|
|
$8.20 |
|
|
|
|
|
|
|
|
|
|
|
Bridge System Maintenance |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Bridge - metal (major rehab) |
|
|
|
|
|
|
|
Metal grid panel - replace as required |
|
1 |
SF |
$15.00 |
|
|
|
Metal frame - replace as required |
|
1 |
SF |
$13.75 |
|
|
|
Railing - metal - replace as required |
|
1 |
SF |
$16.67 |
|
|
|
Support structure/footing - repair as required |
|
1 |
SF |
$27.50 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.40 |
|
|
|
|
|
|
|
$73.32 |
|
|
|
|
|
|
|
|
|
|
|
Bridge - metal (routine maintenance) |
|
|
|
|
|
|
|
Metal grid panel - clean and repair |
|
1 |
SF |
$7.50 |
|
|
|
Metal frame - clean and repair |
|
1 |
SF |
$6.88 |
|
|
|
Railing - metal - clean and repair |
|
1 |
SF |
$8.33 |
|
|
|
Support structure/footing - clean and repair |
|
1 |
SF |
$13.75 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.40 |
|
|
|
|
|
|
|
$36.86 |
|
|
|
Bridge - timber (major rehab) |
|
|
|
|
|
|
|
Timber plank |
|
1 |
SF |
$6.00 |
|
|
|
Timber frame |
|
1 |
SF |
$6.00 |
|
|
|
Railing - timber |
|
1 |
SF |
$12.50 |
|
|
|
Support structure/footing |
|
1 |
SF |
$6.88 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.40 |
|
|
|
|
|
|
|
$31.78 |
|
|
|
|
|
|
|
|
|
|
|
Bridge - timber (routine maintenance) |
|
|
|
|
|
|
|
Timber plank |
|
1 |
SF |
$3.00 |
|
|
|
Timber frame |
|
1 |
SF |
$3.00 |
|
|
|
Railing - timber |
|
1 |
SF |
$6.25 |
|
|
|
Support structure/footing |
|
1 |
SF |
$3.44 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.40 |
|
|
|
|
|
|
|
$16.09 |
|
|
|
|
|
|
|
|
|
|
|
Bridge - synthetic (major rehab) |
|
|
|
|
|
|
|
Synthetic plank |
|
1 |
SF |
$3.75 |
|
|
|
Synthetic frame |
|
1 |
SF |
$5.25 |
|
|
|
Railing - synthetic |
|
1 |
SF |
$9.58 |
|
|
|
Support structure/footing |
|
1 |
SF |
$1.72 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.40 |
|
|
|
|
|
|
|
$20.70 |
|
|
|
Bridge - synthetic (routine maintenance) |
|
|
|
|
|
|
|
Synthetic plank |
|
1 |
SF |
$1.88 |
|
|
|
Synthetic frame |
|
1 |
SF |
$2.63 |
|
|
|
Railing - synthetic |
|
1 |
SF |
$4.79 |
|
|
|
Support structure/footing |
|
1 |
SF |
$0.86 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.40 |
|
|
|
|
|
|
|
$10.55 |
|
|
|
|
|
|
|
|
|
|
|
Culvert Maintenance |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Culvert - 18" dia. (routine maint.) |
|
|
|
|
|
|
|
Culvert - repair and replace as required |
|
1 |
LF |
$5.00 |
|
|
|
Site clearing/demolition |
|
1 |
LF |
$0.80 |
|
|
|
|
|
|
|
$5.80 |
|
|
|
Culvert - 18" dia. (major rehab) |
|
|
|
|
|
|
|
Culvert |
|
1 |
LF |
$50.00 |
|
|
|
Grading - fine |
|
1 |
LF |
$0.45 |
|
|
|
Site clearing/demolition |
|
1 |
LF |
$0.80 |
|
|
|
|
|
|
|
$51.25 |
|
|
|
Culvert - 24" dia. (routine maint.) |
|
|
|
|
|
|
|
Culvert - repair and replace as required |
|
1 |
SF |
$6.00 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$1.00 |
|
|
|
|
|
|
|
$7.00 |
|
|
|
Culvert - 24" dia. (major rehab) |
|
|
|
|
|
|
|
Culvert |
|
1 |
SF |
$60.00 |
|
|
|
Grading - fine |
|
1 |
SF |
$0.60 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$1.00 |
|
|
|
|
|
|
|
$61.60 |
|
|
|
Culvert - 36" dia. (routine maint.) |
|
|
|
|
|
|
|
Culvert |
|
1 |
SF |
$9.00 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$1.40 |
|
|
|
|
|
|
|
$10.40 |
|
|
|
Culvert - 36" dia. (major rehab) |
|
|
|
|
|
|
|
Culvert |
|
1 |
SF |
$90.00 |
|
|
|
Grading - fine |
|
1 |
SF |
$0.90 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$1.40 |
|
|
|
|
|
|
|
$92.30 |
|
|
|
Culvert - 48" dia. (routine maint.) |
|
|
|
|
|
|
|
Culvert |
|
1 |
SF |
$12.00 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$1.80 |
|
|
|
|
|
|
|
$13.80 |
|
|
|
Culvert - 48" dia. (major rehab) |
|
|
|
|
|
|
|
Culvert |
|
1 |
SF |
$120.00 |
|
|
|
Grading - fine |
|
1 |
SF |
$1.20 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$1.80 |
|
|
|
|
|
|
|
$123.00 |
|
|
|
Parking Lot Maintenance |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Parking lot - asphalt (major rehab) |
|
|
|
|
|
|
|
Asphalt overlay |
|
1 |
SF |
$2.85 |
|
|
|
Striping |
|
1 |
SF |
$0.07 |
|
|
|
Base compaction |
|
1 |
SF |
$0.40 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.75 |
|
|
|
|
|
|
|
$4.07 |
|
|
|
|
|
|
|
|
|
|
|
Parking lot - asphalt (routine maintenance) |
|
|
|
|
|
|
|
Asphalt - patch and repair |
|
1 |
SF |
$1.15 |
|
|
|
Striping |
|
1 |
SF |
$0.07 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.75 |
|
|
|
|
|
|
|
$1.97 |
|
|
|
|
|
|
|
|
|
|
|
Parking lot - concrete (major rehab) |
|
|
|
|
|
|
|
Concrete - vehicular |
|
1 |
SF |
$10.50 |
|
|
|
Striping |
|
1 |
SF |
$0.07 |
|
|
|
Base compaction |
|
1 |
SF |
$0.40 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$2.25 |
|
|
|
|
|
|
|
$13.22 |
|
|
|
|
|
|
|
|
|
|
|
Parking lot - concrete (routine maintenance) |
|
|
|
|
|
|
|
Concrete - patch and repair |
|
1 |
SF |
$3.50 |
|
|
|
Striping |
|
1 |
SF |
$0.07 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$2.25 |
|
|
|
|
|
|
|
$5.82 |
|
|
|
|
|
|
|
|
|
|
|
Parking lot - gravel (major rehab) |
|
|
|
|
|
|
|
Gravel - 4" thk. |
|
1 |
SF |
$1.04 |
|
|
|
Grading - fine |
|
1 |
SF |
$0.30 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.40 |
|
|
|
|
|
|
|
$1.74 |
|
|
|
|
|
|
|
|
|
|
|
Parking lot - gravel (routine maintenance) |
|
|
|
|
|
|
|
Gravel - touch up 2" thk. |
|
1 |
SF |
$0.52 |
|
|
|
Grading - fine |
|
1 |
SF |
$0.30 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.40 |
|
|
|
|
|
|
|
$1.22 |
|
|
|
|
|
|
|
|
|
|
|
Trailhead Access Road Maintenance |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Trailhead - asphalt surface (major rehab) |
|
|
|
|
|
|
|
Asphalt overlay |
|
1 |
SF |
$2.85 |
|
|
|
Base compaction |
|
1 |
SF |
$0.40 |
|
|
|
Entry sign - clean and repair |
|
1 |
LS |
$1,500.00 |
|
|
|
Gate/bollard - repair as required |
|
1 |
LS |
$1,250.00 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.75 |
|
|
|
|
|
|
|
$23,870.00 |
|
|
|
|
|
|
|
|
|
|
|
Trailhead - asphalt surface (routine maintenance) |
|
|
|
|
|
|
|
Asphalt - patch and repair |
|
1 |
SF |
$1.15 |
|
|
|
Base compaction |
|
1 |
SF |
$0.25 |
|
|
|
Entry sign - clean and repair |
|
1 |
LS |
$500.00 |
|
|
|
Gate/bollard - repair as required |
|
1 |
LS |
$750.00 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.75 |
|
|
|
|
|
|
|
$12,602.00 |
|
|
|
|
|
|
|
|
|
|
|
Trailhead - concrete surface (major rehab) |
|
|
|
|
|
|
|
Concrete - vehicular |
|
1 |
SF |
$10.50 |
|
|
|
Base compaction |
|
1 |
SF |
$0.40 |
|
|
|
Entry sign - clean and repair |
|
1 |
LS |
$1,500.00 |
|
|
|
Gate/bollard - repair as required |
|
1 |
LS |
$1,250.00 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.75 |
|
|
|
|
|
|
|
$64,262.00 |
|
|
|
|
|
|
|
|
|
|
|
Trailhead - concrete surface (routine maintenance) |
|
|
|
|
|
|
|
Concrete - patch and repair |
|
1 |
SF |
$3.50 |
|
|
|
Base compaction |
|
1 |
SF |
$0.25 |
|
|
|
Entry sign - clean and repair |
|
1 |
LS |
$500.00 |
|
|
|
Gate/bollard - repair as required |
|
1 |
LS |
$750.00 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.75 |
|
|
|
|
|
|
|
$25,010.00 |
|
|
|
Trailhead - gravel surface (major rehab) |
|
|
|
|
|
|
|
Gravel - 4" thk. |
|
1 |
SF |
$1.04 |
|
|
|
Entry sign - clean and repair |
|
1 |
LS |
$1,500.00 |
|
|
|
Gate/bollard - repair as required |
|
1 |
LS |
$1,250.00 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.75 |
|
|
|
|
|
|
|
$12,195.33 |
|
|
|
|
|
|
|
|
|
|
|
Trailhead - gravel surface (routine maintenance) |
|
|
|
|
|
|
|
Gravel - touch up 2" thk. |
|
1 |
SF |
$0.52 |
|
|
|
Grading - fine |
|
1 |
SF |
$0.30 |
|
|
|
Entry sign - clean and repair |
|
1 |
LS |
$500.00 |
|
|
|
Gate/bollard - repair as required |
|
1 |
LS |
$750.00 |
|
|
|
Site clearing/demolition |
|
1 |
SF |
$0.75 |
|
|
|
|
|
|
|
$9,539.60 |
|
|
|
|
|
|
|
|
|
|
|
Restroom Maintenance |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Restroom building (major rehab) |
|
48 |
SF |
|
|
|
|
Exterior cleaning and repair |
|
280 |
SF |
$1,260.00 |
|
|
|
Interior - clean and repair |
|
280 |
SF |
$1,680.00 |
|
|
|
Signage - replace |
|
1 |
LS |
$750.00 |
|
|
|
Toilet room accessories - replace |
|
1 |
EA |
$1,450.00 |
|
|
|
Plumbing fixtures - replace as required |
|
1 |
EA |
$2,250.00 |
|
|
|
Connection and piping to existing sewer system |
|
1 |
ALW |
$750.00 |
|
|
|
Floor drain - repair as required |
|
1 |
EA |
$750.00 |
|
|
|
Lighting and controls - replace |
|
48 |
SF |
$960.00 |
|
|
|
|
|
|
|
$9,850.00 |
|
|
|
|
|
|
|
|
|
|
|
Restroom building (routine maintenance) |
|
48 |
SF |
|
|
|
|
Exterior - clean and repair |
|
280 |
SF |
$700.00 |
|
|
|
Interior - clean and repair |
|
280 |
SF |
$980.00 |
|
|
|
Signage - replace |
|
1 |
LS |
$750.00 |
|
|
|
Toilet room accessories - replace |
|
1 |
EA |
$1,450.00 |
|
|
|
Plumbing fixtures - repair as required |
|
1 |
EA |
$1,125.00 |
|
|
|
Connection and piping to existing sewer system |
|
1 |
ALW |
$750.00 |
|
|
|
Floor drain - repair as required |
|
1 |
EA |
$750.00 |
|
|
|
Lighting and controls - replace |
|
48 |
SF |
$960.00 |
|
|
|
|
|
|
|
$7,465.00 |
|