Authentication
1280x Tipe XLSX Ukuran file 1.06 MB
RENCANA ANGGARAN BIAYA BANTUAN RUANG PRAKTEK SISWA (RPS) APBN 2018 PEKERJAAN/BANTUAN : RUANG PRAKTEK SISWA (RPS) NO PERJANJIAN : 11387/D5.4/KU/2018 SEKOLAH : SMK PIJAR ALAM SPESIFIKASI : BANGUNAN BERTINGKAT SUMBER DANA : APBN 2018 HARGA SATUAN JUMLAH SATUAN NO. URAIAN Unit JUMLAH BAHAN TENAGA BAHAN TENAGA I PEKERJAAN PERSIAPAN 1 Bedeng + Bouplank 1 ls 3,100,000 1,801,000 3,100,000 1,801,000 2 Listrik dan air kerja 1 2,500,000 1,000,000 2,500,000 1,000,000 Jumlah Sub Pekerjan PERSIAPAN 5,600,000 2,801,000 8,401,000 II PEKERJAAN GALIAN DAN URUGAN 1 Galian Tanah Pancang 4 bh 200,000 800,000 Manual 30 x 30 x 300 2 Galian Tanah Pondasi 120 x 120 4 bh 150,000 600,000 3 Galian Tanah Pondasi 100 x 100 6 bh 150,000 900,000 4 Galian Tanah Sloof 30 x 50 58 m' 40,000 2,320,000 5 Urugan Kembali 1.00 ls 1,000,000 1,000,000 6 Urugan Lantai ± 20 cm tanah dari luar 132 2 45,000 25,000 5,940,000 3,300,000 m Jumlah Sub Pekerjaan GALIAN dan URUGAN 5,940,000 8,920,000 14,860,000 III PEKERJAAN PONDASI 3 1 Pancang Manual 135 kg/m 4 bh 646,000 181,000 2,584,000 724,000 3 2 Pondasi 120 x 120 123 kg/m 4 bh 706,000 266,000 2,824,000 1,064,000 3 3 Pondasi 100 x 100 140 kg/m 6 bh 482,000 198,000 2,892,000 1,188,000 Jumlah Sub Pekerjan PONDASI 8,300,000 2,976,000 11,276,000 IV PEKERJAAN SLOOF 3 4 SLOOF Gantung 110 kg/m 42 m' 466,000 133,000 19,572,000 1,006,000 Jumlah Sub Pekerjan PONDASI dan SLOOF 19,572,000 1,006,000 20,578,000 V PEKERJAAN KOLOM + BALOK 3 1 Kolom 30 x 50 116 kg/m 10 bh 1,849,000 281,000 18,490,000 2,810,000 3 2 Kolom 30 x 30 /Selasar 105 kg/m 4 bh 1,409,000 200,000 5,636,000 800,000 3 3 Balok Induk 25 x 40 240 kg/m 44 m' 576,000 101,000 25,344,000 4,444,000 3 4 Balok Anak 20 x 30 231 kg/m 24 m' 379,000 59,000 9,096,000 1,416,000 3 5 Lisplang Selasar 20 x 40 183 kg/m 12 m' 474,000 68,000 5,688,000 816,000 Jumlah Sub Pekerjan KOLOM dan BALOK 64,254,000 10,286,000 74,540,000 3 2 VI PEKERJAAN PLAT BETON 100 kg/m 130 m 381,000 67,000 49,530,000 8,710,000 58,240,000 VII PEKERJAAN DINDING 1 Pasangan Bata 1 : 4 102.9 2 53,800 40,000 5,537,000 4,116,000 m 2 Plesteran dan Acian 205.8 2 17,000 65,000 3,499,000 13,377,000 m Jumlah Sub Pekerjan DINDING 9,036,000 17,493,000 26,529,000 VIII PEKERJAAN KUSEN DAN DAUN 1 Kusen Pintu 1 bh 800,000 100,000 800,000 100,000 2 Kusen Jendela 15 lb 400,000 75,000 6,000,000 1,125,000 3 Daun Pintu 2 bh 750,000 200,000 1,500,000 400,000 4 Daun Jendela 15 bh 250,000 50,000 3,750,000 750,000 5 Pekerjaan Gantungan 6 set 150,000 25,000 900,000 150,000 Jumlah Sub Pekerjan KUSEN DAN JENDELA 12,950,000 2,525,000 15,475,000 2 IX PEKERJAAN PLAFON 131 m 71,000 50,000 9,301,000 6,550,000 15,851,000 Unit HARGA SATUAN JUMLAH SATUAN NO. URAIAN JUMLAH BAHAN TENAGA BAHAN TENAGA X PEKERJAAN LANTAI 131 2 91,000 30,000 11,921,000 3,930,000 15,851,000 m XI PEKERJAAN FINISHING 1 Cat Tembok 205.8 2 5,000 25,000 1,029,000 5,145,000 m 2 Cat Plafon 131 2 5,000 30,000 655,000 3,930,000 m 3 Cat Kayu 25 2 12,000 20,000 300,000 500,000 m 5 Instalasi Listrik 4 Titik 300,000 200,000 1,200,000 800,000 Jumlah Sub Pekerjan FINISHING 3,184,000 10,375,000 13,559,000 JUMLAH DANA KONSTRUKSI 275,160,000 374,805,630 XII PERENCANAAN DAN PENGAWASAN 1 Biaya Perencanaan (3 % x Biaya Konstruk 8,254,000 2 Biaya Pengawasan (2% x Biaya Konstruks 5,503,000 JUMLAH 13,757,000 III BIAYA PENGELOLAAN Biaya Pengelolaal Administrasi (2 % x Biaya Konstruksi) 2,751,000 JUMLAH 2,751,000 Resume : Biaya Pekerjaan Konstruksi 275,160,000 Biaya Perencanaan dan Pengawasan 13,757,000 Biaya Pengelolaan Administrasi 2,751,000 Jumlah Biaya Yang Dikeluarkan 291,668,000 Bekasi, Desember 2018 Kepala SMK PIJAR ALAM Dody Lusianawati, S.Pd NIP. - 1,801,000 1.8% 1,000,000 1.3% 3.05% 0.3% 0.2% 0.3% 0.8% 0.4% 3.4% 5.40% 8,920,000 1.2% 1.4% 1.5% 4.10% 2,976,000 7.5% 7.48% 1,006,000 7.7% 2.3% 10.8% 3.8% 2.4% 27.09% 10,286,000 21.17% 8,710,000 21.2% 3.5% 6.1% 9.64% 17,493,000 0.3% 2.6% 0.7% 1.6% 0.4% 5.62% 2,525,000 5.76% 6,550,000 5.8% 5.76% 3,930,000 5.8% 0.0% 2.2% 1.7% 0.3% 0.7% 4.93% 10,375,000 275,160,000 75,572,000 100.0% 100.00% 27.5% -
no reviews yet
Please Login to review.