414x Filetype XLS File size 0.12 MB Source: www2.calstate.edu
Sheet 1: Instructions
| Completing the Design-Bid-Award A/E Exhibits | |||
| Legend: | |||
| [Insert…] | Edit/Insert project information as indicated. | ||
| A data entry cell. User to enter appropriate information. | |||
| Formatting is automatic. Do not enter commas or '$' signs. | |||
| A calculated cell. Values generated by formula based on values entered in select data entry cells. | |||
| Formatting is automatic. Do not enter commas or '$' signs. | |||
| Building Fee Schedule Classification | |||
| Header | Edit/insert agreement number, project name, and name of service provider in header of worksheet. | ||
| Cell D6 | Enter the single digit building schedule classification that most completely represents the project. This is either 0, 1, 2, 3, 4, or 5. Enter or leave 0 (zero) for building type where no dollar value is listed. | ||
| Exhibit B Schedule of Lump Sum Fees for Design-Bid-Award Projects | |||
| Header | Edit/insert agreement number, project name, and name of service provider in header of worksheet. | ||
| Cell E14 | Edit the placeholder value for New Construction. Enter 0 (zero) when none. This value is the Item 5 'Subtotal: Building, Sitework and Escalation" in the 2-7. It includes Item 1 'Total Building', Item 2 'Total Site work' and Item 4 'Escalation'. Enter or leave 0 (zero) if there is no dollar value. | ||
| Cell F14 | Edit the placeholder value for Building Fee Type. A value of 1, 2, 3, 4, or 5 must be entered to calculate fees. A entry of zero here will return a 'zero' for fee. | ||
| Cell E16 | Edit the placeholder value for Renovation Construction. Enter 0 (zero) when none. This value is the Item 5 'Subtotal: Building, Sitework and Escalation' in the 2-7. It includes Item 1 'Total Building', Item 2 'Total Site work' and Item 4 'Escalation'. Enter or leave 0 (zero) if there is no dollar value. | ||
| Cell F16 | Edit the placeholder value for Building Fee Type. A value of 1, 2, 3, 4, or 5 must be entered to calculate fees. A entry of zero here will return a 'zero' for fee. | ||
| Exhibit C Project Design Schedule | |||
| Header | Edit/insert agreement number, project name, and name of service provider in header of worksheet. | ||
| Dates | Enter desired dates (dd/mm/yy). These are the original target dates. The Agreement describes how these dates shall be further defined and adjusted during the course of the project. | ||
| Exhibits D Submittal Requirements & Procedure Guide for CSU Capital Projects | |||
| Download current Pro Guide edition from CPDC A/E website, This is Exhibit D. Attach it, along with the completed Agreement, Rider A, and Exhibits A, B, C, and E to complete the Agreement package. | |||
| Exhibits E Architect/Engineer Hourly Rate Schedules Applicable to this Project | |||
| Include the Architect's and their Normal Consulting Engineer's hourly rates schedules applicable to the project. Assemble and label each 'Exhibit E, Page x of y'. |
| BUILDING SCHEDULE CLASSIFICATION | ||||||
| This project is classified as a Schedule | 2 | Building for purposes of fee calculation. | ||||
| Schedule 1 | Schedule 3 - continued | |||||
| 101 | Monuments | 317 | Industrial Arts | |||
| 102 | Entrance Structure | 318 | Language Arts | |||
| 103 | Bridges | 319 | Music | |||
| 104 | Other | 320 | Physical Education/ Gymnasium/ Dance Studios | |||
| 321 | Psychology | |||||
| Schedule 2 | 322 | Social Science | ||||
| 201 | Biological Science | 323 | Other | |||
| 202 | Cafeteria | |||||
| 203 | College Union | |||||
| 204 | Computer Facility | Schedule 4 | ||||
| 205 | Health Clinic | 401 | Amphitheater | |||
| 206 | Little Theater & Auditorium (<500 seats) | 402 | Parking Lot | |||
| 207 | Library/ Information Resource Center | 403 | Parking Structure | |||
| 208 | Museum & Gallery | 404 | Residence/Student Housing | |||
| 209 | Performing Arts Facility/ Theatre (500+ seats) | 405 | Site Development | |||
| 210 | Physical Science | 406 | Stadium | |||
| 211 | Student Recreation Center | 407 | Utilities/ Infrastructure/ Telecom | |||
| 212 | Other | 408 | Other | |||
| Schedule 3 | Schedule 5 | |||||
| 301 | Administration | 501 | Corporation Yard (warehouses) | |||
| 302 | Agriculture | 502 | Farm Building (simple) | |||
| 303 | Aquatic Facility | 503 | Other | |||
| 304 | Art | |||||
| 305 | Asbestos Abatement/Alterations | |||||
| 306 | Bookstore | |||||
| 307 | Business Admin./ Student Business Services | |||||
| 308 | Central Heating and Cooling Plant | |||||
| 309 | Child Care | |||||
| 310 | Cogeneration Buildings & Equipment | |||||
| 311 | Corporation Yard (shops) | |||||
| 312 | Education | |||||
| 313 | Engineering | |||||
| 314 | Faculty Offices | |||||
| 315 | Home Economics | |||||
| 316 | Humanities |
| Exhibit B | |||||||||
| SCHEDULE OF LUMP SUM FEES for DESIGN-BID-AWARD PROJECTS | |||||||||
| ARCHITECTS/ENGINEER'S BASIC SERVICES | |||||||||
| Date: | |||||||||
| Project: | [Insert] | This is a look up table | |||||||
| Campus: | [Insert] | Not necessary to print | |||||||
| A/E: | [Insert] | ||||||||
| A/E FEE CALCULATION | Construction | Building Type | A/E | A/E Fee as a % | Fee Calculation Information | ||||
| Budget | (0,1,2,3,4, or 5) | Fee | of Construction (3) | LOG Calculations & Coefficients | |||||
| New Construction | $0 | 0 | Err:502 | ||||||
| Renovation Construction | $0 | 0 | Err:502 | ||||||
| Err:502 | |||||||||
| Total A/E Construction Budget | $0 | Err:502 | |||||||
| Err:502 | |||||||||
| A/E FEE PAYMENT SCHEDULE (1) | |||||||||
| Schematic | Preliminary | Construction | Construction | Record | |||||
| Total | Design | Design | Documents | Bidding | Administration (2) | Drawings | |||
| 100% | 25% | 15% | 35% | 2% | 21% | 2% | Fee value to 2 places | ||
| $0.00 | |||||||||
| at 25% | - | - | |||||||
| at 50% | Monthly | At 100% | |||||||
| at 75% | - | - | |||||||
| at 100% | |||||||||
| Notes: | |||||||||
| #1) Fee formula is described at CPDC A/E website: | |||||||||
| http://www.calstate.edu/cpdc/Suam/Appendices/Appendix_C.shtml | |||||||||
| #2) Construction Administration fee paid in monthly payments | |||||||||
| equal to the percentage of project's construction completion. | |||||||||
| #3) Fee percentage falls logarithmically as project construction costs increases. | |||||||||
| Fee percentage is a result of the fee calculation. It is not the originator of the fee. | |||||||||
| Fee Summary | |||||||||
| P | Schematics + Design Development | ||||||||
| W | Construction Documents + Bidding | ||||||||
| C | Const. Admin. + Rec. Dwgs. | ||||||||
| TOTAL | Total PWC | ||||||||
no reviews yet
Please Login to review.