indian bank tender document for interior furnishing electrical works of indian bank atm at ratia office of the zonal manager indian bank zonal office karnal architects gurdev group of architects ...

icon picture XLSX Filetype Excel XLSX | Posted on 08 Aug 2022 | 3 years ago
Partial file snippet.
                                  
                      INDIAN BANK 
                        TENDER DOCUMENT  
                               FOR 
                       INTERIOR FURNISHING
                                &
                        ELECTRICAL WORKS
                                OF
                         INDIAN BANK ATM 
                                AT
                              RATIA
                             OFFICE OF THE
                           ZONAL MANAGER 
                        INDIAN BANK, ZONAL OFFICE, 
                               KARNAL
                                                       ARCHITECTS : 
                                              GURDEV GROUP OF ARCHITECTS
                                                SCO 1094-95,  SECTOR 22-B,
                                                  CHANDIGARH – 160 022
                                                  PHONE   : 0172-2712201
                                                  MOBILE  : 094170-08450
                                                DETAILS OF TENDER 
            TENDER  FOR  THE FURNISHING  & ELECTRICAL WORKS IN INDIAN BANK ATM 
                                                        AT RATIA
               1Details of work to be done                                   Interior / Furnishing & Allied 
                                                                             electrical works for the furnishing of 
                                                                             Indian Bank ATM at RATIA
               2Form of Contract                                             Item wise rate
               3Earnest Money                                                Rs. 7,000/- (Seven thousand only) 
                                                                             in form of Demand draft in favour of 
                                                                             Indian Bank, payable at KARNAL.  
               4Period of contract /                                         2 Weeks
                 time of Completion
               5Last Date & time for receiving                                21/12/2021 at 3:30 p.m.
                 of sealed tender. 
               6Liquidated damages for non- completion of work in time       10% of the contract value per week 
                                                                             subject of the contract value.
               7Defect Liability Period                                      12 months (Twelve months) from 
                                                                             the date of virtual completion as 
                                                                             certified by Architect / employer. 
               8Retention amount for 12 months                               8% of the total bill. 
               9Period of submitting of Final bill.                          15 days form the date of 
                                                                             completion.
              10Mobilization Advance / Secured Advance                       No.  Mobilization Advance / secured 
                                                                             Advance will be given to the 
                                                                             Contractor. 
                                                                              
              11Place and date of opening of tender                             21/12/2021 at 4:00 p.m. in the 
                                                                             Office of the AGM, Indian Bank Z.O. 
                                                                             KARNAL.
                                                                         Zonal Manager,   Indian Bank,
                                                                            Zonal Office, KARNAL.
                                            DETAILS OF TENDER 
          TENDER  FOR  THE FURNISHING  & ELECTRICAL WORKS IN INDIAN BANK ATM 
                                                  AT RATIA
            1  The Contractor shall sign each page of this tender. 
            2  Payment to the Contractor Agency shall be made as per actual work done at site.
            3  Quantity of work may increase or decrease at site as per requirement, which shall not affect the rates 
               quoted by the contractor. 
            4  Furnishing works including electrical works etc. shall be done to the complete satisfaction of Bank and 
               Architect-in-charge.
            5  All teak / Cedar wood / rubber wood to be used should be knotless which is to be polished with all 
               background surface preparation coarses maintaining the visibility of wood grains.
            6  The rates to be quoted shall include the cost of material, labour charges, carriage, sales tax, or any / all 
               other taxes any required hardware etc.
            7   The contractor agency shall keep particular vigil on his workers / carpenters / painters etc. to maintain very 
               good workmanship of all items, failing which no payment shall be made and no claim of material / labour 
               used shall be made to him in any case, and the same work shall be executed by him again without charging 
               any extra cost.
            8  All rates shall be quoted in words & figures & any cutting over writing shall be signed. 
            9  All items to be executed as per drawings, if any change is required, the same shall be brought to the notice 
               of Architect-in-Charge. 
           10 Any tender / quotation containing clerical or arithmetical mistakes shall be rejected. 
           11 Any addition, alteration or correction shall be signed and stamped properly
           12 Contractor agencies are advised  (before quoting the rates) to inspect the site of the proposed work. He 
               must go through all drawings and specifications and documents.
           13 The Bank reserves the right to accept / reject any tender / quotation without assigning any reason. 
           14 The Contractor agency should have already executed works of furnishing interiors & exterior, civil works  of 
               very good  workmanship.
           15 Quality of material and workmanship rejected by the Architect / Concerned Authorities shall be removed 
               immediately by the contractor and rectified / replaced. 
      16 No advance payment shall be made to the Contractor on supply of any material supplied at site for 
        execution. Payment shall only be made on execution of any concerned / particular item. 
      17 The rates shall include the cost of coat of anti termite treatment on all wooden frame work and all 
        commercial ply / board used for partitions and paneling, furniture etc. The contractor/s shall have to 
        dismantle & dispose (which is/are of no use) the existing counters, tables, partitions, false ceiling and 
        electrical items within the quoted cost of the total furnishing works. 
      18 Rates for partitions, paneling, wall cladding and false ceiling shall include cutting and making good of 
        necessary cut-outs/chiseling to be made for electrical conduits, switch boards etc.  
      19 Bank shall not be responsible for any lose or damage to the contractor/labour due to any natural calamity 
        during the course of construction. Contractor is liable to make good all the damages if any, till the work is 
        completed and handed over to the Bank authorities. 
      20 Any payment to the contractor on account of execution of work, whether it is running payment or final, 
        shall be verified by the Architect-in-Charge. 
      21 Unless, otherwise mentioned all materials to be used shall be I.S.I. marked. Failure to do so, the work may 
        be rejected and in that case contractor shall have to remove the defective materials and replace / re-do  the 
        work for which no claim shall be entertained. 
      22 The total work shall be supervised by the Architect-in-Charge and he/she shall be kept fully  informed by the 
        contractor regarding the progress of work. 
      23 Bank may award the work in part or whole to a single party or any other party. 
      24 It may please be noted that the  Bank is not bound to allot the work to the lowest party. And as such, the 
        allotment of work shall be based on workability of rates quoted by the contractor on account of quality 
        work. 
      25 The bank reserves the right to reject any or all the tenders without assigning any reason whatsoever.
      26 The earnest money deposited shall not carry any interest and will be refunded to the unsuccessful 
        tenderers. 
      27 Earnest money paid by the contractor shall be forfeited by by the Bank if contractor fails to undertake the 
        job if he is communicated about acceptance his rates/tender.
      28 28. The contractor shall take all the necessary precautions while working and to safe guard adjacent 
        property, Bank’s property, Bank’s Employees, and traffic persons.
      29 29. All the rates quoted are inclusive of removal of existing counters, partitions, wiring,  rubbish/ debris 
        collected during the progress of work, rejected materials etc.
      30 The contractor shall not directly or indirectly sublet the work to other party without written permission of 
        the Bank.
      31 31. The quantities mentioned in schedule are provisional and likely to increase/decrease to any extent or 
        may be omitted  thus altering the aggregate value of the contract. No claim for loss of profit / business shall 
        be entertained on this account.
      32 The Bank reserves the right to distribute the work for which quotations have been called, among more than 
        one parties, if found necessary. No claim in this respect shall be considered and the contractor agrees to 
        cooperate with other agencies appointed by the Bank.
      33 All the workers of the contractor must be properly covered by an insurance policy under “Workman’s 
        Compensation act” and “Fatal Accidents Act”. The contractor at his own expenses arrange to effect and 
        maintain until the virtual completion of the contract, insurance policy in the joint name of Bank and the 
        contractor against this risk to be retained by the Bank until the virtual completion of the work, and 
        indemnify the Bank from all the liabilities arising out of such events. In case of delay, contractor shall 
        arrange to extend insurance policy till work is completed.
The words contained in this file might help you see if this file matches what you are looking for:

...Indian bank tender document for interior furnishing electrical works of atm at ratia office the zonal manager karnal architects gurdev group sco sector b chandigarh phone mobile details in work to be done allied form contract item wise rate earnest money rs seven thousand only demand draft favour payable period weeks time completion last date receiving pm sealed liquidated damages non value per week subject defect liability months twelve from virtual as certified by architect employer retention amount total bill submitting final days mobilization advance secured no will given contractor place and opening agm zo shall sign each page this payment agency made actual site quantity may increase or decrease requirement which not affect rates quoted including etc complete satisfaction architectincharge all teak cedar wood rubber used should knotless is polished with background surface preparation coarses maintaining visibility grains include cost material labour charges carriage sales tax any...

no reviews yet
Please Login to review.