Sheet 1: Rekap (2)
| PERUSAHAAN DAERAH AIR MINUM | ||||||||||
| KOTA MALANG | -109 | |||||||||
| 69 | ||||||||||
| REKAPITULASI RENCANA ANGGARAN BIAYA | ||||||||||
| PEKERJAAN | : | Pembuatan Tabung Pompa Water Tank Buring Tengah | ||||||||
| L O K A S I | : | Tandon Air Buring Tengah | ||||||||
| Kota Malang | ||||||||||
| No. | URAIAN PEKERJAAN | J U M L A H | ||||||||
| 1 | 2 | 3 | ||||||||
| I. | PEKERJAAN PERSIAPAN : | Rp. | 100,000.00 | |||||||
| II. | PEKERJAAN TANAH : | Rp. | 3,185,180.32 | |||||||
| III. | PEKERJAAN BETON : | Rp. | 1,529,245.60 | |||||||
| VI | PEKERJAAN BESI DAN PIPA : | |||||||||
| 1 | Bahan | |||||||||
| a. | GI | Rp. | PDAM | |||||||
| b. | PE PN 12.5 | Rp. | PDAM | |||||||
| c. | Accesories | Rp. | PDAM | |||||||
| 2 | Upah | |||||||||
| a. | Pemasangan Pipa GI | Rp. | 7,372,453.60 | |||||||
| b. | Pemasangan PE 12,5 | Rp. | 463,388.63 | |||||||
| c. | Pengeboran | Rp. | 5,166,187.50 | |||||||
| d. | Biaya Tapping ( Penyambungan ) | Rp. | 3,207,127.70 | |||||||
| V | PEKERJAAN PENGECATAN : | Rp. | 58,866.04 | |||||||
| VI | PEKERJAAN PENYELESAIAN : | Rp. | 100,000.00 | |||||||
| J u m l a h | Rp. | 21,182,449.38 | ||||||||
| Jumlah Total | Rp. | 21,182,449.38 | ||||||||
| Dibulatkan | Rp. | 21,182,000.00 | ||||||||
| Terbilang : ( Dua puluh satu juta seratus delapan puluh dua ribu ) | ||||||||||
| Keterangan : | ||||||||||
| - | Analisa berdasarkan satuan SNI | Dua puluh satu juta seratus delapan puluh dua ribu | ||||||||
| - | Harga belum termasuk PPN 10% | |||||||||
| Malang, ...................................... | ||||||||||
| Dibuat oleh, | ||||||||||
| Manajer Perencanaan Teknik | ||||||||||
| ISWAGIANTONO, ST | ||||||||||
| NPP. 03920283 | ||||||||||
| Mengetahui, | Mengetahui, | |||||||||
| Direktur Adm. & Keuangan | Direktur Teknik | |||||||||
| ANITA SARI, SH, MH | Ir. H. TEGUH CAHYONO. MAB. | |||||||||
| Disetujui, | ||||||||||
| Untuk Dilaksanakan | ||||||||||
| Direktur Utama | ||||||||||
| H. M JEMIANTO. | ||||||||||
| Malang, ........................................... | ||||||||||
| Diperiksa, | Dibuat oleh, | |||||||||
| Direktur Teknik | Manajer Perencanaan Teknik | |||||||||
| Ir. H. BAMBANG PURJITO, MM. | KUSBIANTO, ST. | |||||||||
| NPP. 08830083 | NPP. 01840096 | |||||||||
| Disetujui, | ||||||||||
| Untuk Dilaksanakan | ||||||||||
| Direktur Utama | ||||||||||
| Drs. H. HERYADI SANTOSO, MSi. | ||||||||||
| NPP. 01810027 | ||||||||||
| Rp. | 21,182,449.38 | |||||||||
| BIAYA SURVEY & DESIGN 2 % | Rp. | 423,648.99 | ||||||||
| BIAYA UMUM 2 % | Rp. | 423,648.99 | ||||||||
| PERUSAHAAN DAERAH AIR MINUM | |||||||||||
| KOTA MALANG | |||||||||||
| RENCANA ANGGARAN BIAYA | |||||||||||
| PEKERJAAN | : | Pembuatan Tabung Pompa Water Tank Buring Tengah | |||||||||
| L O K A S I | : | Tandon Air Buring Tengah | |||||||||
| Kota Malang | |||||||||||
| HARGA ( Rp. ) | |||||||||||
| No. | URAIAN PEKERJAAN | SATUAN | VOLUME | ANALISA | SATUAN | JML. HARGA | JML. HARGA | ||||
| SATUAN | SELURUH | ||||||||||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | ||||
| I. | PEKERJAAN PERSIAPAN : | ||||||||||
| Pengukuran / Uit Set | - | - | pas | 100,000.00 | 100,000.00 | ||||||
| 100,000.00 | |||||||||||
| II. | PEKERJAAN TANAH : | ||||||||||
| Galian tanah biasa h=1m | m3 | 6.25 | : B.01 | 66,137.50 | 413,359.38 | ||||||
| Galian Pipa Ø200mm panjang 21m | m3 | 6.62 | : B.01 | 66,137.50 | 437,499.56 | ||||||
| Pek. Urugan Tanah | m3 | 13.97 | : B.12 | 167,120.60 | 2,334,321.38 | ||||||
| 3,185,180.32 | |||||||||||
| III. | PEKERJAAN BETON : | ||||||||||
| Pembuatan Thrust Block | m3 | 0.14 | : G.32 | 10,619,761.10 | 1,529,245.60 | ||||||
| 1,529,245.60 | |||||||||||
| IV. | PEKERJAAN BESI DAN PIPA : | ||||||||||
| 1. | Bahan | ||||||||||
| a | GI | ||||||||||
| Chasing Pipa GI Ø12'' | m' | 6.00 | pas | PDAM | PDAM | ||||||
| PIPA GI Ø4'' | m' | 7.30 | pas | PDAM | PDAM | ||||||
| PDAM | |||||||||||
| b | PE PN 12.5 | ||||||||||
| Pipa PE PN 12.5 Ø 200 | m' | 21.00 | pas | PDAM | PDAM | ||||||
| PDAM | |||||||||||
| c | Accesories | ||||||||||
| Anker baut | Kg | 2.86 | pas | PDAM | PDAM | ||||||
| Blind flange Ø12'' | bh | 1.00 | pas | PDAM | PDAM | ||||||
| Plat untuk Blind Flange Ø12'' tbl 2cm | bh | 1.00 | pas | PDAM | PDAM | ||||||
| Flange Ø 4" | bh | 4.00 | pas | PDAM | PDAM | ||||||
| Flange Ø 12" | bh | 2.00 | pas | PDAM | PDAM | ||||||
| Pak Karet Ø12'' | bh | 3.00 | pas | PDAM | PDAM | ||||||
| Pak Karet Ø4'' | bh | 9.00 | pas | PDAM | PDAM | ||||||
| Pak Karet Ø8'' | bh | 2.00 | bh | PDAM | PDAM | ||||||
| Mur baut dan ring Flange Ø12'' | bh | 36.00 | pas | PDAM | PDAM | ||||||
| Mur baut dan ring Flange Ø4'' | bh | 32.00 | pas | PDAM | PDAM | ||||||
| All Flange Bend Ø 4" 90◦ | bh | 1.00 | pas | PDAM | PDAM | ||||||
| All Flange Bend Ø 4" 45◦ | bh | 2.00 | pas | PDAM | PDAM | ||||||
| All Flange Bend Ø 8'' 45° | bh | 1.00 | pas | PDAM | PDAM | ||||||
| Valve Ø 4" | bh | 1.00 | pas | PDAM | PDAM | ||||||
| Flange Reducer Ø 4" x Ø8" | bh | 1.00 | pas | PDAM | PDAM | ||||||
| Flange Adaptor Universal Ø8" | bh | 4.00 | pas | PDAM | PDAM | ||||||
| Flange Adaptor Universal Ø4" | bh | 2.00 | pas | PDAM | PDAM | ||||||
| Air Release Ø1'' | bh | 1.00 | pas | PDAM | PDAM | ||||||
| All Flange Tee Ø 12 x Ø 8 | bh | 1.00 | pas | PDAM | PDAM | ||||||
| Manometer Ø1/2" | bh | 1.00 | pas | PDAM | PDAM | ||||||
| Double Nepel Ø1/2" | bh | 1.00 | pas | PDAM | PDAM | ||||||
| Shock drat dalam dilas ke pipa | bh | 1.00 | pas | PDAM | PDAM | ||||||
| Stop Kran Ø1/2" | bh | 1.00 | pas | PDAM | PDAM | ||||||
| Tapping Saddle Ø500x200 mm | bh | 1.00 | pas | PDAM | PDAM | ||||||
| PDAM | |||||||||||
| 2. | Upah | ||||||||||
| a. | Pemasangan Pipa GI | ||||||||||
| Pasang Chasing Ø12'' h=6 m | m' | 6.00 | : R.39 | 124,090.73 | 744,544.41 | ||||||
| Pasang pipa Ø4'' h=7,3 m | m' | 7.30 | : R.35 | 24,511.75 | 178,935.78 | ||||||
| Pengelasan pipa chasing Ø12'' | cm' | 753.60 | : K.07 | 4,932.45 | 3,717,096.69 | ||||||
| Pengelasan pipa Ø4'' | cm' | 251.20 | : K.07 | 4,932.45 | 1,239,032.23 | ||||||
| Pengelasan anker baut | cm | 175.34 | : K.08 | 4,932.45 | 864,844.50 | ||||||
| Potong pipa Ø12'' | cm | 94.20 | pas | 4,000.00 | 376,800.00 | ||||||
| Potong pipa Ø4'' | cm | 62.80 | pas | 4,000.00 | 251,200.00 | ||||||
| 7,372,453.60 | |||||||||||
| b. | Pemasangan PE 12,5 | ||||||||||
| Pasang Pipa PE PN 12.5 Ø 200 | m' | 21.00 | : R.117 | 22,066.13 | 463,388.63 | ||||||
| 463,388.63 | |||||||||||
| c. | Pengeboran | ||||||||||
| Bor Ø 60cm h= 5,2 m | m' | 5.20 | : B.24 | 656,718.75 | 3,414,937.50 | ||||||
| Bor crossing pipa Ø200mm h=4 m | m' | 4.00 | : B.22 | 437,812.50 | 1,751,250.00 | ||||||
| 5,166,187.50 | |||||||||||
| d | Biaya Tapping ( Penyambungan ) | ||||||||||
| Pipa PE PN 12.5 Ø 500x200 | Titik | 1.00 | : R.164d | 3,207,127.70 | 3,207,127.70 | ||||||
| 3,207,127.70 | |||||||||||
| V. | PEKERJAAN PENGECATAN : | ||||||||||
| Cat besi (epoxy zincromit) | m² | 0.50 | : N.25 | 117,235.00 | 58,866.04 | ||||||
| 58,866.04 | |||||||||||
| VI. | PEKERJAAN PENYELESAIAN : | ||||||||||
| Pembersihan lokasi | - | - | ls | 100,000.00 | 100,000.00 | ||||||
| 100,000.00 | |||||||||||
| Urug Pasir | m3 | #NAME? | Err:509 | Err:509 | Err:509 | ||||||
| Pas. Batu Kali | m3 | #NAME? | Err:509 | Err:509 | Err:509 | ||||||
| Kawat Tali Galvanis 3mm | Kg | 19.00 | Err:509 | Err:509 | Err:509 | ||||||
| Moor baut ф 16 mm | bh | 19.00 | Err:509 | Err:509 | Err:509 | ||||||
| Ring ф 16 mm | bh | 76.00 | Err:509 | Err:509 | Err:509 | ||||||
| Kawat duri | m1 | 114.00 | Err:509 | Err:509 | Err:509 | ||||||
| II. | PEKERJAAN TANAH : | ||||||||||
| Galian Tanah | m3 | 0.57 | Err:509 | Err:509 | Err:509 | ||||||
| Err:509 | |||||||||||
| III. | PEKERJAAN PASANGAN : | ||||||||||
| Plesteran | m2 | #REF! | : E.06 | 23,740.28 | #REF! | ||||||
| #REF! | |||||||||||
| PERUSAHAAN DAERAH AIR MINUM | ||||||||||
| KOTA MALANG | -109 | |||||||||
| 69 | ||||||||||
| REKAPITULASI RENCANA ANGGARAN BIAYA | ||||||||||
| PEKERJAAN | : | Pembuatan Tabung Pompa Water Tank Buring Tengah | ||||||||
| L O K A S I | : | Tandon Air Buring Tengah | ||||||||
| Kota Malang | ||||||||||
| No. | URAIAN PEKERJAAN | J U M L A H | ||||||||
| 1 | 2 | 3 | ||||||||
| I. | PEKERJAAN PERSIAPAN : | Rp. | 100,000.00 | |||||||
| II. | PEKERJAAN TANAH : | Rp. | 3,185,180.32 | |||||||
| III. | PEKERJAAN BETON : | Rp. | 1,529,245.60 | |||||||
| VI | PEKERJAAN BESI DAN PIPA : | |||||||||
| 1 | Bahan | |||||||||
| a. | GI | Rp. | 14,459,717.80 | |||||||
| b. | PE PN 12.5 | Rp. | 9,712,500.00 | |||||||
| c. | Accesories | Rp. | 133,243,033.57 | |||||||
| 2 | Upah | |||||||||
| a. | Pemasangan Pipa GI | Rp. | 7,372,453.60 | |||||||
| b. | Pemasangan PE 12,5 | Rp. | 463,388.63 | |||||||
| c. | Pengeboran | Rp. | 5,166,187.50 | |||||||
| d. | Biaya Tapping ( Penyambungan ) | Rp. | 3,207,127.70 | |||||||
| V | PEKERJAAN PENGECATAN : | Rp. | 58,866.04 | |||||||
| VI | PEKERJAAN PENYELESAIAN : | Rp. | 100,000.00 | |||||||
| J u m l a h | Rp. | 178,597,700.75 | ||||||||
| PPN 10% | Rp. | 17,859,770.08 | ||||||||
| Jumlah Total | Rp. | 196,457,470.83 | ||||||||
| Dibulatkan | Rp. | 196,457,000.00 | ||||||||
| Terbilang : ( Seratus sembilan puluh enam juta empat ratus lima puluh tujuh ribu ) | (160,737,930.68) | |||||||||
| Keterangan : | ||||||||||
| - | Analisa berdasarkan satuan SNI | Seratus sembilan puluh enam juta empat ratus lima puluh tujuh ribu | ||||||||
| - | Harga sudah termasuk PPN 10% | |||||||||
| Malang, ...................................... | ||||||||||
| Dibuat oleh, | ||||||||||
| Manajer Perencanaan Teknik | ||||||||||
| ISWAGIANTONO, ST | ||||||||||
| NPP. 03920283 | ||||||||||
| Mengetahui, | Mengetahui, | |||||||||
| Direktur Adm. & Keuangan | Direktur Teknik | |||||||||
| ANITA SARI, SH, MH | Ir. H. TEGUH CAHYONO. MAB. | |||||||||
| Disetujui, | ||||||||||
| Untuk Dilaksanakan | ||||||||||
| Direktur Utama | ||||||||||
| H. M JEMIANTO. | ||||||||||
| Malang, ........................................... | ||||||||||
| Diperiksa, | Dibuat oleh, | |||||||||
| Direktur Teknik | Manajer Perencanaan Teknik | |||||||||
| Ir. H. BAMBANG PURJITO, MM. | KUSBIANTO, ST. | |||||||||
| NPP. 08830083 | NPP. 01840096 | |||||||||
| Disetujui, | ||||||||||
| Untuk Dilaksanakan | ||||||||||
| Direktur Utama | ||||||||||
| Drs. H. HERYADI SANTOSO, MSi. | ||||||||||
| NPP. 01810027 | ||||||||||
| Rp. | 178,597,700.75 | |||||||||
| BIAYA SURVEY & DESIGN 2 % | Rp. | 3,571,954.02 | ||||||||
| BIAYA UMUM 2 % | Rp. | 3,571,954.02 | ||||||||
no reviews yet
Please Login to review.